SYSE.Application:6.6 - 5. Separate nominal cycle arithmetic from qualified delivery capability
After the two expected changeovers, the nominal machining time is:
- 480 - 2 × 25 = 430 minutes;
- 430 / 3 = 143.33 nominal cycles, or at most 143 complete cycles under those assumptions;
- 120 × 3 = 360 nominal machining minutes, leaving 70 minutes before other demands on that same capacity.
This arithmetic has no allowance for yield loss, rework, interruption, loading assumptions omitted from the quoted cycle, inspection that uses the same constrained resources, or transport. It also says nothing about coating capacity, batch size, lead time or whether returned acceptable parts meet the day’s delivery boundary. Extra work on independent resources need not subtract directly from the machine’s 430 minutes, but it can still constrain delivery.
Use OPS.10.1 to construct the capacity account from the needed acceptable output, actual processing and rework passes, opening work, resource demands and provider returns. Use OPS.10.2 to place those operations within their availability and delivery constraints. To qualify delivery, obtain the production values and limits needed for that claim. An established capacity bound may already rule out an arrangement.
Suppose 71 additional minutes of machine unavailability leave 359 minutes after changeovers. If three minutes is only a nominal cycle, these figures leave the result open: 120 passes of 2.99 minutes take 358.8 minutes. If every required pass instead has an established lower bound of three minutes, this machine cannot complete 120 new passes today. For a conclusion about delivery, include eligible stock and work already done, together with what other routes can supply by the deadline. If every allowed combination still requires more than 359 minutes here, delivery is impossible. With no other supply and only 0.2 minute of eligible opening work, at least 359.8 minutes remain. Available finished stock could change the delivery answer while leaving the machine bound intact. Conversely, 430 available minutes cover the nominal machining load; they leave yield, coating and timely return to establish.
One conforming specimen does not establish the process distribution or its sustained behavior. The NIST/SEMATECH process-capability Method is a bounded historical statistical source: its familiar capability indices compare a stable process with specification limits under applicable distribution and sampling conditions. Qualify the measurement chain separately. Distinguish relevant variants and operating conditions, and justify any pooling before interpreting a capability index.
The producer can assign these contributions to qualify production.
| Contribution needed for this production case | What its receiver needs before the dependent claim can proceed |
|---|---|
| Tooling, program and changeover qualification | An operative procedure and evidence for the intended machine, material, fixture variants, program/configuration and changeover conditions, including the failed or interrupted case. |
| Finished-part measurement and acceptance | A qualified measurement chain with applicable uncertainty and an authorized decision rule for the coated bore and identified part/lot population. |
| Sustained process capability | Suitable observations from the qualified measurement process, stability and model checks, and a justified capability result for the relevant conditions. The NIST source is used only where its Method applies. |
| Acceptable-part delivery capacity | An end-to-end result including yield, rework, constrained resources, provider capacity, transport, waiting and the actual delivery horizon; not the isolated nominal cycle count. |
| Nonconforming-material and recovery disposition | An authorized way to identify and segregate affected material, determine permitted inspection/rework/replacement or acceptance, and establish the result before reuse. |
Use the available Library Methods for the stated constructions. Obtain or develop the physical procedures still missing, and obtain the case inputs and qualification results needed by the receiving decision.