Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

SYSE.Application:4.4 - 4. Continue with realization, configuration, and assurance

The realization Agent applies SYSE.3 to the retained arrangement and identifies its first unsupported realization branch: whether the internal integration Agent can configure the supervisory layer and produce the commissioning evidence before the need date. A vendor or AI contribution can supply a specific result to integration. If the company must also be able to produce the result independently, establish what its team can do with the support it will actually retain. To attribute a gain to training, compare earlier and later independent work under comparable conditions and establish the contribution of the training.

SYSE.13 identifies controller, software, interface, sensor, and greenhouse configuration and effectivity. SYSE.10 keeps the hardware-in-the-loop replay results tied to the claims assessed by that replay. SYSE.4 states which acceptance claims may rely on those observations and which still need greenhouse commissioning evidence. SYSE.14 governs the later change and release decision. Performed integration Work, accepted configuration, payment, provider duty, and changed internal capability remain results of their own Methods.