RMP.10:5.2 - Genuine Escalation: EC-417 Evidence Reconciliation
In this constructed case, ordinary records leave open whether internal and supplier-originated evidence reconciliation follow the same rule or require different branches. The distinction matters to evidence closure on EC-417. Case access and practitioner capacity make a larger inquiry worthwhile. The team uses twelve cases to develop accounts and reserves a thirteenth to discriminate among them.
- four firmware-only and four internal harness-plus-firmware releases accepted versioned provisional pinout evidence before safety closure;
- four supplier-originated releases required signed evidence at closure;
- four reconciliation boards were observed;
- CDM probes involved two supplier, two software, one hardware, and one safety practitioner; and
- a thirteenth supplier-originated change was reserved unseen for the held-out discriminator.
| Evidence move | Scenario contribution | Limit retained |
|---|---|---|
| observation and artifacts | Observed evidence versions, board records, integration bundles, approval states and closure results. | These establish what was visible in the cases examined. Population rates and unrecorded judgements require other grounds. |
| CDM probes | cues, considered options, judgments about provisional versus signed evidence, and counterfactual reflections in critical incidents | retrospective recall and interviewer effects remain |
| event-log analysis | Recorded recurrence and deviations in evidence-version, integration, approval and closure events. | Interpret the fields by their event semantics. Inferring intent or a reusable rule needs appropriate evidence. |
| expert synthesis | Choice of twelve development cases and one held-out case, an internal/supplier split, the contradiction rule, the test of rivals and the stopping judgement. | These are the reconstruction team’s choices in this example. |
Before inspecting the thirteenth case, the team recorded three rival predictions:
| Account or rival | Cues and decision predicted | Variation and result predicted |
|---|---|---|
C-Evidence-Reconcile-Internal applied beyond its observed scope | internally controlled versioned evidence would be the decisive cue; the internal reconciliation role could decide the branch without a distinct supplier approval | supplier origin would not change the branch; closure could proceed from the internal reconciliation result without signed supplier approval |
C-Evidence-Reconcile-Supplier | supplier-owned configuration and restricted geometry would be decisive; supplier responsibility and signed approval would remain required for closure | reversible early integration could occur, but a signed-delta comparison and affected verification would precede either closure or an explicit missing-approval stop |
R-Rig-Capacity-Only | Lack of rig capacity would trigger the hold and the decision to wait for the next slot. | The same branch would apply to internal and supplier changes, and the hold would clear when rig access returned. |
In the held-out case the team found supplier-owned geometry, restricted provider access and available rig capacity. The team allowed reversible early integration and withheld closure pending signed supplier approval. It required a signed-delta comparison and one affected verification, then closed after approval arrived. Those observations fit the supplier-scoped predictions. The hold despite available rig capacity contradicts the capacity-only rival for this case. The requirement for supplier approval contradicts extrapolating the internal account to this case.
There is another account compatible with the observations. For both origins, provisional evidence could permit reversible integration, while closure requires signed confirmation from the responsible configuration owner. This common rule also predicts the hold in the thirteenth case. The eight internal records cited here describe early integration. To distinguish this rule from one permitting internal closure on provisional evidence, inspect the applicable internal closure instruction or an internal closure for which the invoked basis can be established. An absent signature in an incomplete file would leave the question open.
For the thirteenth case, the team can report that supplier confirmation held up closure while the rig was available. For internal cases it can report the use of provisional evidence before closure. These two findings concern different stages. On the cited evidence a common closure rule and distinct internal and supplier rules remain candidates. If the commission concerns the supplier hold alone, the supported explanation is already usable. For the comparison of reusable rules, give the remaining distinction and the evidence needed to settle it. Transfer to other configurations, formal Method identification, effectiveness and population frequency require grounds appropriate to those claims.