RMP.10:5 - Archetypal Grounding
RMP.10:5.1 - Ordinary A.3.1.MR Stop
A maintenance team compares the current calibration instruction with a proposed replacement. The current instruction says to wait for the job submitter to supply a missing instrument identifier. The proposed edition also permits the planner to recover the identifier from an approved register and verify that it designates the instrument in the job. The team asks how the current instruction was used in six recorded jobs and whether the proposed wording would allow a different response to the missing input. The six linked records share the current instruction, input schema, equipment configuration and decision authority. One records a stop because the identifier was missing.
A.3.1.MR can return a source-traceable account of the six jobs, including the recorded stop. Reading both instructions establishes the difference in permitted responses. If the register supplies a verifiable identifier, the proposed instruction allows planning to resume on that basis. If neither the submitter’s identifier nor a verified register match is available, the stop still applies. These grounds answer the comparison. The earlier records describe use of the current instruction. To report that anyone actually used the replacement, the team would need evidence from its use.
RMP.10:5.2 - Genuine Escalation: EC-417 Evidence Reconciliation
In this constructed case, ordinary records leave open whether internal and supplier-originated evidence reconciliation follow the same rule or require different branches. The distinction matters to evidence closure on EC-417. Case access and practitioner capacity make a larger inquiry worthwhile. The team uses twelve cases to develop accounts and reserves a thirteenth to discriminate among them.
- four firmware-only and four internal harness-plus-firmware releases accepted versioned provisional pinout evidence before safety closure;
- four supplier-originated releases required signed evidence at closure;
- four reconciliation boards were observed;
- CDM probes involved two supplier, two software, one hardware, and one safety practitioner; and
- a thirteenth supplier-originated change was reserved unseen for the held-out discriminator.
| Evidence move | Scenario contribution | Limit retained |
|---|---|---|
| observation and artifacts | Observed evidence versions, board records, integration bundles, approval states and closure results. | These establish what was visible in the cases examined. Population rates and unrecorded judgements require other grounds. |
| CDM probes | cues, considered options, judgments about provisional versus signed evidence, and counterfactual reflections in critical incidents | retrospective recall and interviewer effects remain |
| event-log analysis | Recorded recurrence and deviations in evidence-version, integration, approval and closure events. | Interpret the fields by their event semantics. Inferring intent or a reusable rule needs appropriate evidence. |
| expert synthesis | Choice of twelve development cases and one held-out case, an internal/supplier split, the contradiction rule, the test of rivals and the stopping judgement. | These are the reconstruction team’s choices in this example. |
Before inspecting the thirteenth case, the team recorded three rival predictions:
| Account or rival | Cues and decision predicted | Variation and result predicted |
|---|---|---|
C-Evidence-Reconcile-Internal applied beyond its observed scope | internally controlled versioned evidence would be the decisive cue; the internal reconciliation role could decide the branch without a distinct supplier approval | supplier origin would not change the branch; closure could proceed from the internal reconciliation result without signed supplier approval |
C-Evidence-Reconcile-Supplier | supplier-owned configuration and restricted geometry would be decisive; supplier responsibility and signed approval would remain required for closure | reversible early integration could occur, but a signed-delta comparison and affected verification would precede either closure or an explicit missing-approval stop |
R-Rig-Capacity-Only | Lack of rig capacity would trigger the hold and the decision to wait for the next slot. | The same branch would apply to internal and supplier changes, and the hold would clear when rig access returned. |
In the held-out case the team found supplier-owned geometry, restricted provider access and available rig capacity. The team allowed reversible early integration and withheld closure pending signed supplier approval. It required a signed-delta comparison and one affected verification, then closed after approval arrived. Those observations fit the supplier-scoped predictions. The hold despite available rig capacity contradicts the capacity-only rival for this case. The requirement for supplier approval contradicts extrapolating the internal account to this case.
There is another account compatible with the observations. For both origins, provisional evidence could permit reversible integration, while closure requires signed confirmation from the responsible configuration owner. This common rule also predicts the hold in the thirteenth case. The eight internal records cited here describe early integration. To distinguish this rule from one permitting internal closure on provisional evidence, inspect the applicable internal closure instruction or an internal closure for which the invoked basis can be established. An absent signature in an incomplete file would leave the question open.
For the thirteenth case, the team can report that supplier confirmation held up closure while the rig was available. For internal cases it can report the use of provisional evidence before closure. These two findings concern different stages. On the cited evidence a common closure rule and distinct internal and supplier rules remain candidates. If the commission concerns the supplier hold alone, the supported explanation is already usable. For the comparison of reusable rules, give the remaining distinction and the evidence needed to settle it. Transfer to other configurations, formal Method identification, effectiveness and population frequency require grounds appropriate to those claims.
RMP.10:5.3 - A Specialist Programme Can Finish without a New Case
A retired repair service used two routing practices. Ordinary A.3.1.MR recovery from mixed logs and instruction editions leaves two possibilities for an urgent route, a repeatable cue-based branch and a supervisor override. A museum archive wants a qualified comparison of these accounts for the final year of the service.
Distinguishing the missing cue would change the archive’s comparison enough to justify the source work. The team selects dated routing sheets and critical-incident interviews with two available former dispatchers. The sheets record whether replacement stock was present. The logs record the chosen route. Linking both to the same occurrences shows that the disputed route accompanied absent stock in the accessible cases. Both dispatchers recall using the stock cue, and each describes an exception that required a supervisor. The sheets and logs support the recorded association. Attribute the recalled reasons and exceptions to the interviewees, within the limits of recall.
The archive can compare a stock-conditioned candidate branch and a reported supervisor exception with the earlier instruction. Return the source links, limits of recall and gaps outside the accessible cases. The service has closed. A new simulation would examine present performance under changed conditions. It could not supply an observation of the disputed historical occurrences.
The reconstruction answers the archive’s question at the supported scope. If a later operator proposes reusing the branch, examine its fit for the new conditions and what the earlier evidence can support there.