PSDA.7:5.1 - Which flood-pump uncertainty matters now?
In the illustrative pre-season inquiry, nominal permanent and mobile capacity meets the assumed inflow only with the stated units operating. The model omits arrival delay. The team cannot turn that conditional result into “mobile service is reliable”.
| Relied-on or proposed claim | Evidence limit | Decision-linked return |
|---|---|---|
| Nominal mobile capacity is adequate. | The capacity calculation assumes operating units on site. | Use for capacity only. It does not discriminate the missing deployment arrangement. |
| Mobile units can serve the district after road loss. | No qualified arrival and deployment result exists for that condition. | Keep M conditional for service. A qualified route-loss deployment result could close the gap. Seek it if the intended use warrants the effort. |
| The two technical models corroborate the inflow assumption. | Both use the same inflow dataset. | Record the shared evidence dependency. Independent corroboration would require a separate basis. |
| Pumping-service hours represent all affected residents’ loss. | Reachable assistance and property protection have different meanings. | Return the missing consequence relation or keep separate accounts; a tighter inflow estimate will not settle the value question. |
A later qualified deployment result can narrow the arrival range and change the claims that depend on it. If the range includes conditions where service fails, identify the condition for robustness rather than asserting unconditional feasibility. A common power-supply uncertainty can leave all arrangements unqualified even where their relative order is fixed. Evidence of a common failure can establish that they all fail.