PSDA.7:5 - Archetypal Grounding
PSDA.7:5.1 - Which flood-pump uncertainty matters now?
In the illustrative pre-season inquiry, nominal permanent and mobile capacity meets the assumed inflow only with the stated units operating. The model omits arrival delay. The team cannot turn that conditional result into “mobile service is reliable”.
| Relied-on or proposed claim | Evidence limit | Decision-linked return |
|---|---|---|
| Nominal mobile capacity is adequate. | The capacity calculation assumes operating units on site. | Use for capacity only. It does not discriminate the missing deployment arrangement. |
| Mobile units can serve the district after road loss. | No qualified arrival and deployment result exists for that condition. | Keep M conditional for service. A qualified route-loss deployment result could close the gap. Seek it if the intended use warrants the effort. |
| The two technical models corroborate the inflow assumption. | Both use the same inflow dataset. | Record the shared evidence dependency. Independent corroboration would require a separate basis. |
| Pumping-service hours represent all affected residents’ loss. | Reachable assistance and property protection have different meanings. | Return the missing consequence relation or keep separate accounts; a tighter inflow estimate will not settle the value question. |
A later qualified deployment result can narrow the arrival range and change the claims that depend on it. If the range includes conditions where service fails, identify the condition for robustness rather than asserting unconditional feasibility. A common power-supply uncertainty can leave all arrangements unqualified even where their relative order is fixed. Evidence of a common failure can establish that they all fail.
PSDA.7:5.2 - Development evidence with three different limits
For a ninety-day organization recommendation, suppose the adviser has an immediate human assessment, a queue model for the current team, and an offline AI benchmark. Each can inform a different bounded claim.
The human assessment does not establish retention or transfer to later service Work. The queue model does not establish the performance of a reallocated or mixed arrangement without its staffing and interaction premises. The benchmark does not establish current-version service reliability under the operating distribution and oversight arrangement.
Identify the separate questions about representative later work, service in the changed staffing arrangement and the version used under operating conditions. Seek a missing result if its attainable contribution to the recommendation or its grounds warrants the burden. Keep the three evidence limits separate.
PSDA.7:5.3 - A bounded input to SensorCo’s strategic commitment
SensorCo’s illustrative twelve-month question concerns defending devices, offering an integrated service, licensing data, or exiting a segment as generic AI inspection prices fall. The strategy team owns the strategic comparison; the board separately holds commitment authority.
Suppose the integrated-service direction depends on uncertain repeat demand and the licence depends on an unsettled permission question. State the demand conditions that could change the service comparison and identify the missing rights interpretation for licensing. Obtain the corresponding evidence or ruling when the intended use needs it.
STR.11 can use this uncertainty result for the specified commitment and compatible horizon. Recheck affected uses if the alternative, claim, demand question, evidence window or commitment changes. For an unavailable or incompatible result, use a qualified direct source or report the remaining gap.
PSDA.7:5.4 - Cheap non-use
An analyst needs to recover which calibration edition a measurement cites, and no candidate comparison is being made. Use the source and evidence practice directly. A decision-linked uncertainty account would add no current result.