HCD.12:5.1 - Transfer requires a positive proposal and a changed resource answer
Fictional learner L17 illustrates how to compare familiar and unfamiliar work.
In two earlier fresh cases, L17 checked configuration evidence and proposed a supported continuation without anyone cueing the mismatch. L17 rejected an FW7 report when HW3/FW8 was required, performed the calculation and explained C’s 23-hour limit. Those observations supply the baseline for this case. They leave adaptation to changed capacity open.
The new case has a report that supports HW3/FW8/SCHED2 and confirms the required checks. Preparation takes one hour per homogeneous batch of up to four; required checks take two hours per change. The twelve weekly arrivals share the required batch conditions and can be grouped in fours. In this case acceptance after the checks is the only way out of the queue. At 24 available hours, ten changes require 23 hours, while twelve require 27. The release manager may authorize a bounded ten-change use and retains responsibility for the growing queue and release decision.
L17 has not rehearsed the evidence-use question with a complete report and no preceding mismatch problem. The new case warrants a positive proposal. Copying the earlier FW7 refusal would leave the available ten-change option unused. Reports, calculator and ordinary source and tool access are available. The traces place L17’s first recognition and proposal before any teacher or AI cue identified the decisive condition.
| Observation | What it supports | What it does not support |
|---|---|---|
| Before any PatternID or configuration cue, L17 checks the complete report and proposes ten changes in three homogeneous batches, requiring 23 hours, and explains that accepting ten would leave two of the twelve new requests open. | Transfer of configuration-evidence use and a bounded positive proposal in this unfamiliar case. | Release authority, elimination of the queue or general transfer across all engineering work. |
| The assessor changes only available time from 24 to 22 hours. L17 initially keeps the ten-change promise. | A demonstrated adaptation failure under the changed resource condition. | A conclusion that the earlier configuration or calculation contribution has disappeared. |
| After feedback asking L17 to check the changed time constraint, L17 calculates that nine changes require 18 + 3 = 21 hours, while ten still require 23, and revises the proposal. | Correct adaptation with feedback. | Independent resource adaptation on the first changed-condition attempt. |
The observations support L17’s tested calculation and configuration judgement. They show an initial capacity-adaptation error and a successful correction with feedback. For stronger reliance on independent capacity adaptation, use adequate uncued evidence or arrange a fresh uncued variation when a suitable observation is missing and its attainable contribution warrants the work. HCD.14 can already use this result to propose a small practice revision.
An assessor who accepts “the evidence is never sufficient, so I refuse” would miss the positive-action criterion in the first row. Scoring only the corrected final answer would also hide the error in L17’s first response to the reduced capacity.