HCD.12:5 - Archetypal Grounding
HCD.12:5.1 - Transfer requires a positive proposal and a changed resource answer
Fictional learner L17 illustrates how to compare familiar and unfamiliar work.
In two earlier fresh cases, L17 checked configuration evidence and proposed a supported continuation without anyone cueing the mismatch. L17 rejected an FW7 report when HW3/FW8 was required, performed the calculation and explained C’s 23-hour limit. Those observations supply the baseline for this case. They leave adaptation to changed capacity open.
The new case has a report that supports HW3/FW8/SCHED2 and confirms the required checks. Preparation takes one hour per homogeneous batch of up to four; required checks take two hours per change. The twelve weekly arrivals share the required batch conditions and can be grouped in fours. In this case acceptance after the checks is the only way out of the queue. At 24 available hours, ten changes require 23 hours, while twelve require 27. The release manager may authorize a bounded ten-change use and retains responsibility for the growing queue and release decision.
L17 has not rehearsed the evidence-use question with a complete report and no preceding mismatch problem. The new case warrants a positive proposal. Copying the earlier FW7 refusal would leave the available ten-change option unused. Reports, calculator and ordinary source and tool access are available. The traces place L17’s first recognition and proposal before any teacher or AI cue identified the decisive condition.
| Observation | What it supports | What it does not support |
|---|---|---|
| Before any PatternID or configuration cue, L17 checks the complete report and proposes ten changes in three homogeneous batches, requiring 23 hours, and explains that accepting ten would leave two of the twelve new requests open. | Transfer of configuration-evidence use and a bounded positive proposal in this unfamiliar case. | Release authority, elimination of the queue or general transfer across all engineering work. |
| The assessor changes only available time from 24 to 22 hours. L17 initially keeps the ten-change promise. | A demonstrated adaptation failure under the changed resource condition. | A conclusion that the earlier configuration or calculation contribution has disappeared. |
| After feedback asking L17 to check the changed time constraint, L17 calculates that nine changes require 18 + 3 = 21 hours, while ten still require 23, and revises the proposal. | Correct adaptation with feedback. | Independent resource adaptation on the first changed-condition attempt. |
The observations support L17’s tested calculation and configuration judgement. They show an initial capacity-adaptation error and a successful correction with feedback. For stronger reliance on independent capacity adaptation, use adequate uncued evidence or arrange a fresh uncued variation when a suitable observation is missing and its attainable contribution warrants the work. HCD.14 can already use this result to propose a small practice revision.
An assessor who accepts “the evidence is never sufficient, so I refuse” would miss the positive-action criterion in the first row. Scoring only the corrected final answer would also hide the error in L17’s first response to the reduced capacity.
HCD.12:5.2 - The named Method supplies what the test meant to observe
In another constructed task the person makes no relevant first move. After the assessor names a method, the person uses it to produce a correct comparison. That observation supports application with a cue. Under the original task criterion, the first response may show a recognition error or leave uncued recognition unresolved.
If the work routinely supplies the method, application with that support may answer the question. If independent selection matters, use suitable evidence from an occasion when the person had to select the method. If that evidence is missing, select a worthwhile uncued task or state the limit.
HCD.12:5.3 - First Use of a Method Supplied by a New Source
Fictional learner S32 can read price and delivery tables and compare individual numbers. The preparation record contains no instruction on finding non-dominated alternatives, and no comparable performance was observed before source access. The question concerns what S32 can do after access to the handout. Successful earlier use of its two-measure method is not a prerequisite.
A one-page handout, Compare Offers on Price and Delivery, supplies the Method: with lower price and earlier delivery preferred, an offer dominates another only when it is no worse on either measure and better on at least one. Compare the offers pairwise and retain those that no other offer dominates. The handout includes a worked two-offer example. The result is a set of remaining choices; selecting one of them still needs the buyer’s priorities and constraints.
After six minutes with the handout, S32 receives a different three-offer task: A costs 120 and arrives in four days; B costs 135 and arrives in three days; C costs 140 and arrives in five days. The criterion requires the retained set and grounds for each elimination or remaining trade-off. The sheet stays open; a calculator is permitted but unused. The teacher and AI supply no further explanation or answer. In seven minutes S32 retains A and B, eliminates C because A is both cheaper and earlier, and explains why neither A nor B dominates the other.
The assessor then changes C’s price to 100, keeping its five-day delivery. With the sheet still available and no feedback on the first answer, S32 now retains all three and explains each price–delivery trade-off. Repeating the previous elimination would fail this task; comparing isolated numbers without the two-measure rule would also be insufficient.
The same observations support different conclusions for three questions.
| Question | Supported answer |
|---|---|
| What was performed after reading? | S32 applied the supplied Method and adapted its result in these two tasks with the handout available. The observation does not cover finding the source independently or later use without it. |
| Did S32’s capability change? | A relevant comparison is missing. The first observed successful application cannot establish what S32 could do before source access or what will remain available later. |
| Did the earlier preparation help S32 learn? | This case does not isolate that contribution. Such a comparison would need relevant differences in preparation, the same learning opportunity and help conditions, and separate application tasks using new data. It remains open. |