FPF.Reference:16.9.9.4.1 - 9.4.1 Preparation now, reopening after performed trials
Invoke C.37.MP only for Method representation profile MRP-EC417-B2-Review-1, because two unlike actions must be related without becoming one view. Both return to candidate C-EC-Release-v2 and current candidate-account episteme ECA-EC417-C-Release-v2-1.
Preparation now. C.37 claim group C37-EC417-B2-Prepare-1 has receiver SafetyReviewer-17 and action ‘check the supplier-prepared signed-versus-provisional pinout comparison and identify the affected safety checks before release’, using the instruction in section 7. Episteme ERP-EC417-WP-B2-1 supplies the proposed allocation and order, evidence entry, confidentiality, recovery and stops, with WorkPlan status preserved. A.2.4 classifies that preparation use, and A.10 path P-APP-EC417-Prepare-1 returns pass in its current-edition window. Under §16.9.7.1 the supplier-configuration practitioner compares the editions and uses schema correspondence A-17 to identify affected fields. SafetyReviewer-17 checks that comparison and identifies the affected safety checks. The WorkPlan supplies premises for both assignments. Their result requires the version-linked comparison and its review. Missing required comparison material, capability, support, permission or authority stops the dependent preparation action under §16.9.5.
C.32.MWA.PP decision AD-EC417-B2-Trial-1 separately governs the trial alternative: its predicate compares A, B and B2 against the receiving, capacity, confidentiality, assignment, permission, authority, evidence and reversibility conditions; its actual outcome selects no more than three prospective B2 trials under those conditions.
Reopening after performed trials. C.37 claim group C37-EC417-B2-Reopen-1 has receiver MethodEngineer-17 and later action ‘decide which findings from performed trial Work reopen the candidate’. WorkPlan WP-EC417-B2-Trial-1 describes up to three trials. At this point the plan supplies no finding from an actual B2 trial. If records establish that two distinct trials each entered R, §16.9.8 gives the authorized release decision maker grounds to return B2 for revision or reject further use. Multiple events in one trial count once. MethodEngineer-17 can decide what to reopen to the extent that the findings identify the affected part of the candidate. Reading that Work through the proposed project, process and case views has a further requirement. Establish the dated Work and the E.17.0 conformance of each candidate episteme to its intended viewpoint edition. No such pair has yet been tested in this case. The profile leaves the view qualification unresolved. A.2.4 classification and the A.10 path can locate grounds for use. The conclusions about performance and conformance depend on their own evidence.
The relation between the uses. The profile connects the shared evidence-entry, confidentiality, recovery and stop conditions. The supplier and reviewer can use qualified WorkPlan premises to prepare and check the comparison. Findings from actual trials can later justify reopening the candidate under §16.9.8. Qualifying the proposed views of that Work also requires their conformance evidence. Each use keeps its own claims, conditions and result.