Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:05:20 UTC

FPF.Reference:16.9.7.1 - Signed-delta preparation for B2

Under B2, the supplier-configuration practitioner prepares the comparison of the signed supplier pinout received for closure with the exact provisional pinout edition used in D-21 integration. Retain both edition identifiers and the provisional uncertainty and use history; identify the changes, and use schema correspondence A-17 to locate the affected integration-bundle fields. SafetyReviewer-17 checks that comparison and identifies the affected traceability and verification checks for the safety board. The preparation result is a version-linked pinout-difference record with the affected checks. The assumed preparation burden remains 1.60 h supplier plus 0.40 h safety; performing affected verification, deciding safety closure, and any integration rework remain separate. Missing signed evidence invokes R as described in section 8.

C.32.MWA.PP keeps several structures distinct:

  • Method relations: the four identified Methods are co-used; every composition/order relation for C-EC-Release-v2 remains proposed;
  • Work relations: A is signed-first; B/B2 are provisional-first then signed reconciliation; each B2 branch that uses AI suggestions contains bounded human Work set W-TraceAcceptReject-17 with one accept/reject occurrence per used suggestion; R can occur only after B2 entry, retains already-performed Work, and repeats that trace-review Work for every repeated AI suggestion;
  • allocation: the counted 4.40 h already exclude B on the peak day. Under B2, transferring 1.60 h leaves about 0.40 h of the 3.20 h peak-day allowance for additional work by the same safety engineer. Include affected verification and rework falling on that engineer that day before concluding that the whole B2 branch fits. Check the named Systems, covering assignments, trace permission and two direct authority relations for the decisions they govern.
  • subject/support/permission/authority: the three decision Systems and their Work remain distinct from their assignments, the trace permission, and the two direct authority relations; supplier configuration, PLM, test rig, and AI provider retain separate responsibility/access/support relations;
  • description correspondence: checklist order corresponds only partially to Work overlap and branch stops;
  • cultural relation: retention of a weekly-integration practice remains a later cultural-continuation question.

AD-EC417-B2-Trial-1 authorizes selection of up to three prospective B2 trials subject to their capacity, confidentiality, evidence, assignment, permission, authority and reversibility conditions. For EC-417 the named assignments, PERM-TraceAcceptReject-17, AUTH-SafetyEvidence-17 and AUTH-ReleaseDecision-17 apply in their stated scope and windows. For each later release establish coverage for the actions that release requires. The decision uses DC-EC417-CadenceMismatch-1 as a non-causal rationale and retains the unsupported causal-use verdict. A is a pre-entry alternative. R is available after B2 entry.