FPF.Reference:16.9.7 - 7. Compare A, B, B2, and R across the structures that change the decision

Before integration the decision maker can consider A, B and B2. For a choice of B2, also assess the burden and remaining prospects for release if signed evidence is missing at closure. R becomes available in that later state, after work and cost have already been incurred.

For this constructed comparison, 2.07 h is safety-engineer time for traceability and safety-closure work: checking the current requirement–implementation–verification correspondences and preparing or recording the closure disposition. It excludes the separately counted signed-delta preparation and 0.33 h board, and any additional affected verification or integration rework.

Choice or recovery branchWork and evidence arrangementAllocation and stop
Await for signed evidence before integration and hold one final reconciliation boardan authorized decision maker may choose A before integration when signed evidence is available or a required B2 entry condition fails, provided A is permitted. Under baseline D-8 availability it misses the target slot by thirteen days.
Bintegrate from an explicit provisional edition at D-21, preserve its uncertainty and use, and reconcile it to signed evidence at D-8; safety engineer performs all signed-delta preparationD-8 safety demand is 2.00 + 0.33 + 2.07 = 4.40 h, or 0.55; reject under the 0.40 peak-day limit
B2follow the B sequence and evidence-history rule, with 1.60 h of signed-delta preparation assigned to the supplier-configuration practitionerthe listed D-8 activities require 0.40 + 0.33 + 2.07 = 2.80 h of the safety engineer, about 0.35 of the working day. Include any further work by that engineer on the same day when checking the peak limit.
Rafter B2 entry and missing signed evidence at closure, preserve performed integration plus the provisional edition, uncertainty, and earlier use; on signed evidence, record the relation/delta, re-baseline, repeat comparison and affected verification, then retain, roll back, or repeat integrationwithhold release; signed evidence supersedes provisional only for closure reliance; a full repeat includes 1.60 h supplier preparation plus 2.80 h safety preparation/board/trace-closure (0.40 + 0.33 + 2.07); affected verification/integration rework is additional and has no fixed case duration. An earlier stop records only the Work and burden actually incurred

The provisional board occurs on D-21 and the signed-evidence board on D-8. Each lasts 20 minutes (rounded to 0.33 h), within the 45-minute limit. Across both days the listed safety work amounts to 4.73 h for B and 3.13 h for B2 before any further verification or integration work. For a peak-day decision include the additional safety work on that day. A total for the whole release also includes such work on other days.

FPF.Reference:16.9.7.1 - Signed-delta preparation for B2

Under B2, the supplier-configuration practitioner prepares the comparison of the signed supplier pinout received for closure with the exact provisional pinout edition used in D-21 integration. Retain both edition identifiers and the provisional uncertainty and use history; identify the changes, and use schema correspondence A-17 to locate the affected integration-bundle fields. SafetyReviewer-17 checks that comparison and identifies the affected traceability and verification checks for the safety board. The preparation result is a version-linked pinout-difference record with the affected checks. The assumed preparation burden remains 1.60 h supplier plus 0.40 h safety; performing affected verification, deciding safety closure, and any integration rework remain separate. Missing signed evidence invokes R as described in section 8.

C.32.MWA.PP keeps several structures distinct:

  • Method relations: the four identified Methods are co-used; every composition/order relation for C-EC-Release-v2 remains proposed;
  • Work relations: A is signed-first; B/B2 are provisional-first then signed reconciliation; each B2 branch that uses AI suggestions contains bounded human Work set W-TraceAcceptReject-17 with one accept/reject occurrence per used suggestion; R can occur only after B2 entry, retains already-performed Work, and repeats that trace-review Work for every repeated AI suggestion;
  • allocation: the counted 4.40 h already exclude B on the peak day. Under B2, transferring 1.60 h leaves about 0.40 h of the 3.20 h peak-day allowance for additional work by the same safety engineer. Include affected verification and rework falling on that engineer that day before concluding that the whole B2 branch fits. Check the named Systems, covering assignments, trace permission and two direct authority relations for the decisions they govern.
  • subject/support/permission/authority: the three decision Systems and their Work remain distinct from their assignments, the trace permission, and the two direct authority relations; supplier configuration, PLM, test rig, and AI provider retain separate responsibility/access/support relations;
  • description correspondence: checklist order corresponds only partially to Work overlap and branch stops;
  • cultural relation: retention of a weekly-integration practice remains a later cultural-continuation question.

AD-EC417-B2-Trial-1 authorizes selection of up to three prospective B2 trials subject to their capacity, confidentiality, evidence, assignment, permission, authority and reversibility conditions. For EC-417 the named assignments, PERM-TraceAcceptReject-17, AUTH-SafetyEvidence-17 and AUTH-ReleaseDecision-17 apply in their stated scope and windows. For each later release establish coverage for the actions that release requires. The decision uses DC-EC417-CadenceMismatch-1 as a non-causal rationale and retains the unsupported causal-use verdict. A is a pre-entry alternative. R is available after B2 entry.