FIN.9:4.1 - Construct the alternatives that actually compete
Start with the corporation’s choice and the work or service it must accomplish. Include continuation without new investment, and retention or return of capital through FIN.21 where relevant. A mandatory service need can make “spend nothing” infeasible while still leaving several ways to meet it. A financially attractive project can be excluded by a real capacity or permission limit. Preserve the distinction between a required constraint and a sponsor’s preference.
Identify which whole alternatives the question asks you to compare and what would exclude others. To admit one package, its own fit to the conditions can suffice. To establish an optimum, a bound can rule out entire classes of alternatives. Projects may be independent, mutually exclusive, complementary or prerequisites for later work. Two projects using the same site can exclude each other; a shared facility can make the combined cost lower than the sum; a first stage can create a later choice. FIN.8 can supply its value when the comparison depends on it.
Recover the baseline used by each valuation. If two projects each count the full benefit of replacing the same old process, adding their NPVs double counts that improvement. If one project presumes that another has already paid for a facility, its apparent standalone value belongs to a different alternative. Rebuild the whole cash account or adjust the contributions explicitly before comparison. FIN.6 supplies the incremental cash calculation. Use alternatives already specified by the decision holder. When their construction or selection is entrusted to the analyst, identify the complete alternatives and combinations needed for the decision and explain their selection. Finding a shared cost in two specified variants is the analyst’s contribution even when the decision holder chose the variants.
A resource shortage can be a genuine external limit or a chosen internal budget. If the budget can be changed, compare the obtainable financing or additional resource with the gain it enables and the costs it creates. Do not silently relax a binding limit because the projects have positive NPV, and do not treat a discretionary budget as an immutable physical fact. Use FIN.10–FIN.12 to establish obtainable financing that could change the available set.