EAM.10:4 - Solution

EAM.10:4.1 - Define complete choices and different kinds of coupling

State the portfolio scope, requested result and horizon. Recover the alternatives and their eligibility from EAM.7–EAM.9. Identify which choices are mutually exclusive, mandatory, optional or dependent, and why. Include continued use or no new work when it is a qualified alternative. An omitted asset can still matter through a shared service or resource.

Distinguish three questions about a proposed combination. A prerequisite or exclusion determines which selections can coexist: a new unit may need an enabling connection, while two replacements for the same role may be mutually exclusive. A shared resource limit constrains the work or use at a particular time: two eligible jobs may need the same crew or exceed an outage allowance. A joint consequence changes what happens when the choices are taken together: common mobilization may reduce cost, while simultaneous demand can require additional provision. One arrangement can create all three, but each needs its own evidence.

For each material relation, identify the affected alternatives, its operating or engineering cause, the time and conditions under which it holds, and the resulting constraint or consequence. EAM.6 supplies service and dependency conditions. A promised saving cannot make a combination technically eligible.

EAM.10:4.2 - Construct the whole consequence account

Start from compatible policies on the same service boundary, perspective and horizon. If an omitted later duty or ending could change the result, establish its consequences through EAM.8 or obtain a sufficient bound. Then describe what work and service the combination entails. Identify shared preparation, enabling work, recurring operation, temporary service and ending consequences. Use the price and conditions for the complete package when they already settle the choice. Obtain component amounts and dates when they can change eligibility, the comparison or the recipient’s next action.

If the question asks what combining the work saves or costs, compare the combination with the attainable separate arrangements on the same basis. For costs on the same basis, joint adjustment = whole-combination cost − sum of standalone costs. A negative amount is a saving; a positive amount is an additional cost. Explain what causes it and when it occurs. Where effects differ by date, construct the dated differences first and obtain their financial value through FIN.9 on the applicable basis. FIN.9 develops this interaction comparison and dated funding constraints; its return must identify the combination, common baseline, perspective, amounts, dates and significant assumptions.

Count each shared consequence once. If two estimates each contain the same mobilization, the combination that uses one mobilization retains one payment. If three jobs share it, reconstruct their common account; summing all three pairwise discounts could remove more mobilizations than were included. If sharing requires extra supervision or temporary service, include that cost too. An allocation of common cost among departments does not by itself create a saving in the whole payment.

Keep unpriced consequences visible. Shared disruption can change a service or environmental result even when the expenditure sum is unchanged. Use EAM.9’s actual criteria to compare those consequences; a cash adjustment cannot silently settle them. When the combination changes a demand or recovery premise, return that premise to EAM.4 or EAM.6 before relying on its qualification.

EAM.10:4.3 - Test constraints and compare the feasible combinations

Write the constraints at the whole-combination scope. Separate initial capital, initial operating expenditure and recurring operating envelopes where they are different decisions. Include later commitments when they bind: the year-three overhaul in an EAM.8 policy needs its funding, crew and service window at that time. A low initial outlay does not establish that later provision. Do not count a resource twice or assume unused funding must be spent.

For a request to find one feasible programme, return a combination that meets all applicable conditions. For the cheapest programme or the best value under a stated rule, cover the competing choices. A feasible option attaining a valid lower cost bound settles the minimum. To identify every option attaining it, also account for ties. CityWater has exactly two choices at each of four stations. Comparing the sixteen combinations is practical and covers that shortlist. In another case, identify the permitted no-work, single and combined choices from the service requirements. Exclude a class of options by a supported prerequisite or bound. Establish timing through EAM.11 when it could invalidate an otherwise eligible option.

For a larger problem, select an optimization or scenario method whose objective, choices, constraints and interactions represent the actual question. Specify what is selectable, which selections imply or exclude others, dated resource use and the joint effects. Model contingent actions with the information available when each action is chosen; the combination cannot assume different early choices for future outcomes that are not yet known. A mathematical optimum applies to the represented set and basis.

When the commission asks for a preference, compare eligible combinations using the applicable value criteria. When required service and other material consequences are equal, minimize total present cost. Otherwise preserve justified trade-offs or a non-dominated set. A cheaper programme that requires more scarce resources does not automatically dominate a dearer one.

EAM.10:4.4 - Explain the choice and the condition that could change it

For a commission to find a workable programme, give one and show how its commitments fit together. If the question asks whether any exists, a bound or another sufficient argument can settle it. A negative answer must exclude every permitted combination. If the available evidence leaves both outcomes possible, identify what remains to be settled. For a preference, also explain which material alternatives it displaces. Test a changed funding limit, engineering qualification, demand driver, shared-work condition or resource date when it could alter the answer. Use coherent conditions across the combination; a common disruption cannot be favorable for one component and absent for another without grounds. When two interventions can share a visit, include the joint cost in the estimate. Credit a single visit to the works actually performed only when their records establish that they shared it.

Return the requested finding or recommendation, the service and resource consequences it depends on and any uncertainty that can change its use to EAM.11 and EAM.12. EAM.13 later returns observations to the premise they affect. If a missing shared-work fact can change the choice, obtain it only when its attainable answer warrants the inquiry’s full burden. A project that remains locally useful can be deferred for a qualified portfolio reason without being relabelled technically poor.