CAD.5:5.3 - Increase the delay, then change the design or the demand
Suppose bus contention changes S’s age from two ticks to four, while F and the requirements remain unchanged. The reconstructed second-coordinate radius becomes
r_2(4)=0.8^4(0.005)+0.02(1+0.8+0.8^2+0.8^3)=0.061088.
The same controller’s next-state bound is 0.8r_2(4)+0.02=0.0688704, which exceeds 0.06. More decisively, four unobserved disturbances plus the next one yield the half-width 0.067232 from :5.2 even if S’s old measurement is exact. F still reveals nothing about the second coordinate. Thus a different filter or gain using the same available information cannot restore this hard bound.
The required behaviour cannot be guaranteed with these channels and timing. For a redesign, consider restoring the qualified two-tick transport arrangement or obtaining a timely observation of the second coordinate. A change to the required behaviour or to the plant calls for the corresponding authority. If the sensor budget becomes 3, H alone supports the same feedback with next-state bounds 0.046 and 0.024; its input bounds are 0.102 and 0.052. H needs no delayed-observation reconstruction. It is now a simpler sufficient choice.
A different task can also justify less information. If the allowed second-coordinate deviation becomes 0.12, retain F and set u_2=0. The unobserved stable second coordinate has the invariant bound
|x_2|\le\frac{0.02}{1-0.8}=0.1<0.12.
S, its delayed packet processing and its input-history reconstruction are then unnecessary. This is sufficient for the changed task; it is not a cheaper solution to the original 0.06 requirement.