Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

C.32.PAD:4.3 - Minimum sufficient relation and slot-change impact

A small complete PAD instance can be this short:

ArchitectureDecisionRelation@OrderFlow:
  decisionId: OrderFlowArchitectureDecision-2026Q3
  projectWorkOccurrenceRef: ProductFamilyQ3OrderArchitectureWork, exact admitted composite U.Work
  decisionSubjectRef: order-integration architecture for product-family Q3
  describedHolonRef: product-family order-flow system
  decisionQuestion: which candidate architecture should guide Q3 order-flow implementation?
  intendedDecisionUse: direct the Q3 implementation work while preserving the stated refinement boundary
  claimScopeRef: order-flow architecture for ProductFamilyQ3OrderArchitectureWork
  decisionWindowRef: accepted for Q3 implementation; reopen on a listed trigger or superseding decision
  candidateBasisRefs: [C32CandidatePalette:order-flow-2026-06]
  selectedArchitectureOptionRefs: [event-carried integration with payment exception]
  selectedStructureEffects:
    - structureKindRef: module structure
      selectedStructureRef: order events between service modules
      decisionEffect: choose the event boundary to support service replacement under the agreed event meanings and delivery conditions, and accept the cost of coordinating schema changes
  architectureCharacteristicTradeoffs:
    - architectureCharacteristicRef: substitutability
      criteriaRowRef: C.32.ACS order-flow substitutability criterion
      expectedGain: service replacement without order-flow rewrite
      acceptedLoss: additional schema-version coordination
      guardrailRef: version-skew eval band
  methodUseInstructions:
    - methodDescriptionRefOrPatternRef: event-schema change method
      expectedStructureEffect: compatible event schemas across service modules
      intendedPerformerSystemRef: the named service-team System intended by the project decision
      intendedPerformerKindRef: ServiceTeamDeveloperSystemRole
      intendedPerformerClassificationRef: the separate classification judgment, when it obtains
      intendedAssignmentRequirementRef: decision content requiring a suitable service-team assignment before implementation Work
      workBoundaryRef: schema refinement left open inside the event boundary fixed by the decision
  architectDeveloperSplit:
    decisionFixedStructureRefs: [event boundary, payment exception]
    openRefinementScopeRefs: [schema fields inside approved event boundary]
    sourceReturnCondition: return to PAD when a field change would break an accepted order, the payment exception, the event boundary or the version-skew band
  holonTransitionOrBOSCTriggerRefs?: [B.2.P: no new operational whole claimed for team-local schema refinement]
  architectureDescriptionRefs: [C.30.AD: event-flow view omits deployment and rollout structure; source-return keeps the model refs recoverable]
  publicationProjectionRef?: C.32.ADR:order-flow-adr
  reopenConditions: [payment latency guardrail crossed, schema-version coordination cost guardrail crossed]
  status: acceptedForDeveloperWork

For this decision a developer may add optional detail while preserving every order form the approved contract accepts. A newly required field can exclude a previously valid order even if the boundary, service name and version label stay the same. Check that ordinary and exception orders still have a feasible route through the new schema. When teams may choose their schemas independently, establish compatibility for the combinations permitted by those choices or provide an authorized way to coordinate them in time. A commission for one agreed pair can be met by establishing the compatibility of that pair. If the field changes a fixed commitment, return that change to its owner. Inspecting a deployment can establish the schema in use. To establish that it made service replacement easier, identify the replacement work and a supported comparison with the previous arrangement. The schema could already have been present before adoption.

When a filled field changes, repair the smallest declaration or claim record that carries the changed content:

Changed filled fieldImmediate repair locus
candidateBasisRefs or selectedArchitectureOptionRefsUse C.32, C.32.MLAO, comparison or selection inputs, then update PAD before ADR projection.
projectSystemOfInterestRef?, intendedProjectSystemClaimRef?, systemOfInterestKindRef?, systemOfInterestClassificationRef?, systemOfInterestAssignmentSpeciesRef?, or systemOfInterestAssignmentOccurrenceRef?Use A.15.6 for actual-versus-intended designation and the compound-selection stop, C.3/A.2 for the exact local kind and its separate classification judgment, and A.2.1 for the declared assignment species and its separately obtaining occurrence. Route unresolved role wording through E.10.ROLE. Keep every independently obtaining Work, change, and use fact; remove any reference the decision alone was being used to prove.
architectureInfluenceCorrespondenceRef?Use C.32.CONWAY. Keep a frame for modal or unresolved sides and cite an exact pair row only for the already obtaining direct occurrence and its exact C.30 architecture-relation participants.
transformationFlowStructureNetworkRef?, projectNetworkSelectionResultRef?, or architectureTransformationFlowStructureRelationRef?Use E.18.NET for exact network identity, A.15.6/C.2.1 for the project-question judgment, and C.30.TFS-REL for architecture use. Update or remove only the affected refs; do not copy or repair network members, relations, constraints, endpoints, or use frame inside PAD.
selectedStructureEffectsRepair the architecture claim or selected-structure view in C.30, C.30.AD, or C.30.ASV; then update PAD consequences.
architectureCharacteristicTradeoffsRepair C.32.ACS, C.32.ACE, C.25, C.16, or comparison input before relying on the decision.
methodUseInstructions or architectDeveloperSplitRepair Method, plan, intended-System, local-kind, separate System-classification, assignment, actual-Work, readiness, and work-boundary claims through their subject patterns. Route unresolved role wording through E.10.ROLE; use A.15, E.8, E.11.PUR, or C.24 only for the claim that pattern defines, constrains, or tests.
holonTransitionOrBOSCTriggerRefs?Use B.2.P for wording and claim-kind recovery; use B.2 only when the decision depends on whole reidentification.
structuralInformationLensUseRefs?Recheck the mathematical assumptions and relevant preservation or loss. Use C.29 when representation choice, transfer or reliance remains unresolved; return to source when a consequential loss changes.
publicationProjectionRef?Repair the projection through C.32.ADR, any source-backed face through E.17, and actual publication/availability through E.24.PUB as applicable; do not rewrite the decision by template pressure.
reopenConditions or supersedesDecisionRefs?Update PAD and the active ADR-like projection; old decisions remain historical unless a governed archival policy says otherwise.