C.32.PAD:4 - Solution
Establish the decision relation with its exact composite project U.Work, candidate basis or binding condition, selected option, affected structures, any trade-offs, rationale, consequences and reopen conditions. Include the Method expectations and work split needed to guide its intended use. A single written account can develop and record these values; its form does not establish the decision.
Work in this order:
- Name the composite project
U.Workparticipant and the decision subject: described holon, decision question, intended use, ClaimScope, decision window, and status. If the decision designates a project system-of-interest, recover the named extended enterprise and agreement grounds under A.1.STM:4.1; cite the existingU.Systemor the pre-inception intended-system claim. Add a local kind only when it is current, add a separate System-classification judgment only when that judgment independently obtains, and add an assignment only through its separately declared A.2.1 species and obtaining occurrence whose holder is that System. RouteSystemOfInterestRolesource wording throughE.10.ROLE; establish every Work, change, and use fact through its own predicate and pattern. For a needed compound project-selection claim, apply A.15.6:4.1a to its sufficient local semantics and case facts. Returnmissing-substrate[project-selection-conjunction]only for unavailable required semantics; missing or failed facts retain their own outcomes. - Give the basis for the chosen design. If the commission permits any conforming option, identify the option and how it meets the binding conditions. If the decision turns on a preference, cite the alternatives compared. Identify the condition that fixes the design when a prior commitment settles it. For a binding choice, show which implementation remains feasible and what the project can still decide. When the decision calls for comparing alternatives, use
C.32for the candidate palette,C.32.MLAOfor residual-reducing multilevel candidate frames,C.32.CONWAYwhen an influence-source architecture and transformed-side architecture content shaped the candidate, andC.32.FAILfor repaired candidate errors. Cite a C.32.CONWAY synthesis frame while either side is modal or the direct influence relation is unresolved; cite an exact pair row only for its already obtaining direct occurrence and two obtaining C.30 architecture-relation participants. - Cite comparison or selection input only when it exists. Use
A.19.CPMfor explicit comparison,A.19.SelectorMechanismfor set-returning selection,G.5for selected-set result declaration, andC.11for local choice. For publication, useE.24.PUBfor the occurrence and audience availability; addE.17when a source-backed face and source return are needed. - State the selected architecture option or bounded exception. Name the affected structures and explain how they bear on the choice. A pattern reference can locate a rule. When the decision depends on the identity of that rule, resolve
relationFunctionClaimRefto its defining or constraining ClaimGraph. A decision in force can already fix the boundary for later work. To report actual operating behavior, establish what happened in the relevant use. To attribute an improvement to the chosen design, justify the comparison with the relevant alternative. - Record the architecture-characteristic trade-off, or why no live trade-off is needed. Reuse adequate criteria, readings and explanations. Use
C.32.ACS,C.32.ACE,C.16,C.25orC.31for the particular missing criterion, evaluation, measurement, quality bundle or modularity/scale claim. Recover description correspondence and relevant loss throughC.30.AD; useC.29when mathematical representation choice, transfer or reliance remains unresolved. None of these inputs decides the architecture by itself. - Record the rationale and consequences. Identify any rejected options and the losses the project accepts. For organizational architecture, explain how the selected structure can provide the needed capability for the named products, which provision and cooperation it relies on, and who is entitled to accept a consequential change to their commitments. Keep expenditure, financing and expected product benefit distinguishable. A rejected option can remain useful as a stepping stone or archive item; do not turn it into a failure unless the receiving failure pattern is triggered.
- Relate the decision to architecture descriptions it uses. Use
C.30.ADfor architecture-description adequacy andC.30.ASVfor selected-structure view adequacy. A diagram, model, file, or view can describe the decision basis; it does not become the decision relation. - Bind the decision to method-use instructions when the architect needs developers to use a method, pattern, style, toolchain step, or work practice so the described or transformed-side holon is intended to gain or preserve the named structure. Use
A.15,A.15.1,A.15.2,A.15.5,A.6.M,E.8,E.11.PUR, andC.24according to the live claim. - State the architecture-to-refinement boundary. Name selected structures fixed by the decision, refinement scopes left open, source-return conditions, readiness exits, and patterns for any later governance question. For creator development, carry the finite local result and the evidence needed to accept its promised capability into the work boundary. Remaining product-use uncertainty does not make that local work endless; local completion does not establish every later product effect. When level or whole-change wording leaves the boundary unclear, use
C.30.STRATorB.2.Pto recover its meaning. UseB.2for a remaining question about retaining or reidentifying the whole; keep an existing-whole answer when its supported explanation is sufficient, and preserve unresolved grounds; cite the resulting claim inholonTransitionOrBOSCTriggerRefs?when needed. - Use
C.32.ADRwhen an ADR-like description is needed, andE.24.PUBfor actual publication and audience availability. AddE.17when a source-backed face and source return are needed. The description must retain whether the decision is proposed, made or superseded. - Add the evidence, assurance, gate or governance grounds required by the claims being made. Use the subject rule for evidence support,
A.10for a needed replayable source-to-use account,B.3for assurance,A.21for a gate and the applicable governance rule for authority. - Write reopen and supersession conditions. Reopen when the candidate basis changes, a protected architecture characteristic crosses its guardrail, an independently typed influence-source structure or arrangement no longer fits the transformed-side actual or modal architecture content, a stronger source changes the accepted loss, or the decision’s method-use instruction proves unusable.
If one project question uses an E.18.NET network, first preserve that network’s independent A.22/E.18.NET selection. A persistent project-network judgment stays in its C.2.1 result episteme under A.15.6, and architecture use docks through C.30.TFS-REL. A C.32.CONWAY exact pair row may be cited in architectureCorrespondenceRowRefs[] of a network record, but that citation is only a qualified reading: it adds no network member or cross-flow occurrence, and PAD repeats none of the network’s member, relation, constraint, endpoint, or use-frame fields.
C.32.PAD:4.1 - Decision readiness
A C.32.PAD decision is ready to draft when the current decision relation identifies the composite project U.Work participant and can identify the candidate basis or the binding condition that settles the design, one affected selected structure, one architecture-characteristic trade-off or declared reason for no live trade-off, one expected work consequence, one reopen condition, and any triggered holonTransitionOrBOSCTriggerRefs? or structuralInformationLensUseRefs? needed to preserve source return. When system-of-interest local-kind, separate System-classification, assignment, architecture-influence, or network fields are present, the applicable A.15.6, A.2 and A.2.1, C.32.CONWAY, E.18.NET, and C.30.TFS-REL preconditions must already be satisfied or the reference remains absent.
If a contract already fixes the interface, establish which interface it requires, whether the design can satisfy it and which choices remain with the project. A unique admissible option needs grounds for its uniqueness. One option found so far can suffice to show feasibility, while a claim that it is best among further options remains open. Use C.32 to construct alternatives when the decision can still turn on their differences. If the decision lacks adequate architecture criteria, use C.32.ACS or C.25; a separate new row is unnecessary when the needed criterion is already recoverable. If the decision only says “the metric is best”, recover the affected structure, criterion, loss and comparison basis through the applicable C.32.ACE, C.16 or A.19.CPM contribution. If a required work Method is unclear, use its subject pattern and A.15 for the relevant work claim. If an existing system, role assignment, project-network judgment, network selection, architecture use, or influence pair is unresolved, require its subject pattern and keep only the designation, modal claim, candidate frame, or explicit stop in PAD.
A creator-architecture decision uses the product-use, capability and local-result connection from A.1.STM:4.1.1. If the needed resources, cooperation or authority are unresolved, keep the dependent capability or implementation commitment conditional. The decision can select bounded research with its own epistemic acceptance or another supported local result. For shared creators, an accepted loss must identify the affected product commitments and the decision basis that permits changing them; one product’s improved metric supplies neither.
C.32.PAD:4.2 - Constructive architecture decision path
Some architecture decisions are constructive: they prescribe Methods that intended developer Systems are expected to use so that later work aims to produce or preserve intended structures. A decision may name intended Systems, local-kind requirements, separate classification requirements, assignment requirements, plans, commitments, permissions, or authority before any assignment or Work obtains. Admit that path only when the decision keeps those claims separate and names:
- the obtaining architecture relation and selected structure to be preserved, or the exact modal
ArchitectureClaimstating the intended production or preservation effect; - the method description, architectural style, pattern use, or work practice to be used;
- the intended System when known; an optional local kind and an independently optional System-classification judgment; any current assignment through separate species and obtaining-occurrence refs whose holder is that System; and any merely intended assignment as plan, policy, or decision content rather than an occurrence;
- any responsibility or authority claim under its direct predicate, with the required participants, applicability and identity. An obtaining claim needs satisfying case facts; a prospective allocation states its intended participants and conditions without asserting a current occurrence. Use A.6.RCD for a missing predicate, and distinguish that from unknown facts or a failed applicable test;
- the expected structure effect on the described or transformed-side holon, kept modal until its direct C.30 architecture predicate obtains;
- the work-planning boundary and readiness or gate exit;
- the source-return condition and reopen trigger.
These requirements connect the architecture decision to work while keeping its expected structure effect distinct from any independently established actual effect.
C.32.PAD:4.3 - Minimum sufficient relation and slot-change impact
A small complete PAD instance can be this short:
ArchitectureDecisionRelation@OrderFlow:
decisionId: OrderFlowArchitectureDecision-2026Q3
projectWorkOccurrenceRef: ProductFamilyQ3OrderArchitectureWork, exact admitted composite U.Work
decisionSubjectRef: order-integration architecture for product-family Q3
describedHolonRef: product-family order-flow system
decisionQuestion: which candidate architecture should guide Q3 order-flow implementation?
intendedDecisionUse: direct the Q3 implementation work while preserving the stated refinement boundary
claimScopeRef: order-flow architecture for ProductFamilyQ3OrderArchitectureWork
decisionWindowRef: accepted for Q3 implementation; reopen on a listed trigger or superseding decision
candidateBasisRefs: [C32CandidatePalette:order-flow-2026-06]
selectedArchitectureOptionRefs: [event-carried integration with payment exception]
selectedStructureEffects:
- structureKindRef: module structure
selectedStructureRef: order events between service modules
decisionEffect: choose the event boundary to support service replacement under the agreed event meanings and delivery conditions, and accept the cost of coordinating schema changes
architectureCharacteristicTradeoffs:
- architectureCharacteristicRef: substitutability
criteriaRowRef: C.32.ACS order-flow substitutability criterion
expectedGain: service replacement without order-flow rewrite
acceptedLoss: additional schema-version coordination
guardrailRef: version-skew eval band
methodUseInstructions:
- methodDescriptionRefOrPatternRef: event-schema change method
expectedStructureEffect: compatible event schemas across service modules
intendedPerformerSystemRef: the named service-team System intended by the project decision
intendedPerformerKindRef: ServiceTeamDeveloperSystemRole
intendedPerformerClassificationRef: the separate classification judgment, when it obtains
intendedAssignmentRequirementRef: decision content requiring a suitable service-team assignment before implementation Work
workBoundaryRef: schema refinement left open inside the event boundary fixed by the decision
architectDeveloperSplit:
decisionFixedStructureRefs: [event boundary, payment exception]
openRefinementScopeRefs: [schema fields inside approved event boundary]
sourceReturnCondition: return to PAD when a field change would break an accepted order, the payment exception, the event boundary or the version-skew band
holonTransitionOrBOSCTriggerRefs?: [B.2.P: no new operational whole claimed for team-local schema refinement]
architectureDescriptionRefs: [C.30.AD: event-flow view omits deployment and rollout structure; source-return keeps the model refs recoverable]
publicationProjectionRef?: C.32.ADR:order-flow-adr
reopenConditions: [payment latency guardrail crossed, schema-version coordination cost guardrail crossed]
status: acceptedForDeveloperWork
For this decision a developer may add optional detail while preserving every order form the approved contract accepts. A newly required field can exclude a previously valid order even if the boundary, service name and version label stay the same. Check that ordinary and exception orders still have a feasible route through the new schema. When teams may choose their schemas independently, establish compatibility for the combinations permitted by those choices or provide an authorized way to coordinate them in time. A commission for one agreed pair can be met by establishing the compatibility of that pair. If the field changes a fixed commitment, return that change to its owner. Inspecting a deployment can establish the schema in use. To establish that it made service replacement easier, identify the replacement work and a supported comparison with the previous arrangement. The schema could already have been present before adoption.
When a filled field changes, repair the smallest declaration or claim record that carries the changed content:
| Changed filled field | Immediate repair locus |
|---|---|
candidateBasisRefs or selectedArchitectureOptionRefs | Use C.32, C.32.MLAO, comparison or selection inputs, then update PAD before ADR projection. |
projectSystemOfInterestRef?, intendedProjectSystemClaimRef?, systemOfInterestKindRef?, systemOfInterestClassificationRef?, systemOfInterestAssignmentSpeciesRef?, or systemOfInterestAssignmentOccurrenceRef? | Use A.15.6 for actual-versus-intended designation and the compound-selection stop, C.3/A.2 for the exact local kind and its separate classification judgment, and A.2.1 for the declared assignment species and its separately obtaining occurrence. Route unresolved role wording through E.10.ROLE. Keep every independently obtaining Work, change, and use fact; remove any reference the decision alone was being used to prove. |
architectureInfluenceCorrespondenceRef? | Use C.32.CONWAY. Keep a frame for modal or unresolved sides and cite an exact pair row only for the already obtaining direct occurrence and its exact C.30 architecture-relation participants. |
transformationFlowStructureNetworkRef?, projectNetworkSelectionResultRef?, or architectureTransformationFlowStructureRelationRef? | Use E.18.NET for exact network identity, A.15.6/C.2.1 for the project-question judgment, and C.30.TFS-REL for architecture use. Update or remove only the affected refs; do not copy or repair network members, relations, constraints, endpoints, or use frame inside PAD. |
selectedStructureEffects | Repair the architecture claim or selected-structure view in C.30, C.30.AD, or C.30.ASV; then update PAD consequences. |
architectureCharacteristicTradeoffs | Repair C.32.ACS, C.32.ACE, C.25, C.16, or comparison input before relying on the decision. |
methodUseInstructions or architectDeveloperSplit | Repair Method, plan, intended-System, local-kind, separate System-classification, assignment, actual-Work, readiness, and work-boundary claims through their subject patterns. Route unresolved role wording through E.10.ROLE; use A.15, E.8, E.11.PUR, or C.24 only for the claim that pattern defines, constrains, or tests. |
holonTransitionOrBOSCTriggerRefs? | Use B.2.P for wording and claim-kind recovery; use B.2 only when the decision depends on whole reidentification. |
structuralInformationLensUseRefs? | Recheck the mathematical assumptions and relevant preservation or loss. Use C.29 when representation choice, transfer or reliance remains unresolved; return to source when a consequential loss changes. |
publicationProjectionRef? | Repair the projection through C.32.ADR, any source-backed face through E.17, and actual publication/availability through E.24.PUB as applicable; do not rewrite the decision by template pressure. |
reopenConditions or supersedesDecisionRefs? | Update PAD and the active ADR-like projection; old decisions remain historical unless a governed archival policy says otherwise. |