C.32.PAD:4.1 - Decision readiness
A C.32.PAD decision is ready to draft when the current decision relation identifies the composite project U.Work participant and can identify the candidate basis or the binding condition that settles the design, one affected selected structure, one architecture-characteristic trade-off or declared reason for no live trade-off, one expected work consequence, one reopen condition, and any triggered holonTransitionOrBOSCTriggerRefs? or structuralInformationLensUseRefs? needed to preserve source return. When system-of-interest local-kind, separate System-classification, assignment, architecture-influence, or network fields are present, the applicable A.15.6, A.2 and A.2.1, C.32.CONWAY, E.18.NET, and C.30.TFS-REL preconditions must already be satisfied or the reference remains absent.
If a contract already fixes the interface, establish which interface it requires, whether the design can satisfy it and which choices remain with the project. A unique admissible option needs grounds for its uniqueness. One option found so far can suffice to show feasibility, while a claim that it is best among further options remains open. Use C.32 to construct alternatives when the decision can still turn on their differences. If the decision lacks adequate architecture criteria, use C.32.ACS or C.25; a separate new row is unnecessary when the needed criterion is already recoverable. If the decision only says “the metric is best”, recover the affected structure, criterion, loss and comparison basis through the applicable C.32.ACE, C.16 or A.19.CPM contribution. If a required work Method is unclear, use its subject pattern and A.15 for the relevant work claim. If an existing system, role assignment, project-network judgment, network selection, architecture use, or influence pair is unresolved, require its subject pattern and keep only the designation, modal claim, candidate frame, or explicit stop in PAD.
A creator-architecture decision uses the product-use, capability and local-result connection from A.1.STM:4.1.1. If the needed resources, cooperation or authority are unresolved, keep the dependent capability or implementation commitment conditional. The decision can select bounded research with its own epistemic acceptance or another supported local result. For shared creators, an accepted loss must identify the affected product commitments and the decision basis that permits changing them; one product’s improved metric supplies neither.