BA-1 | The built asset is recoverable, and every used architecture description has one ClaimGraph, one EntityOfConcern—built asset, obtaining ArchitectureRelation, or selected structure—and effective reference scheme. | Recover the asset under A.1, subject relations and architecture relation under C.30, selected structure under A.22, and description identity under C.2.1; do not derive the subject from an optional architecture-claim field. |
BA-2 | Every asserted architecture structural view is the same description episteme whose selected-structure EntityOfConcern, structure kind, viewpoint, and independently obtaining E.17.0 conformance relation are named. | Apply A.22, E.17.0, and C.30.ASV; do not use the file, bundle, dashboard, representation, publication, or current use as the structure or view constructor. |
BA-3 | Every relied-on designation names its scheme, designated entity, selected aspect structure, qualification window, and designation/reference relation when one is claimed; design/realization correspondence remains a separate claim or relation. | Recover the direct designation/reference owner and occurrence, or keep a bounded designation-use claim; never use repeated spelling as entity identity or parthood proof. |
BA-4 | Exchange checking and architecture evaluation have different evaluated objects and governors; source episteme, representation, publication occurrence, form, carrier, actual subject relations, selected structures, and descriptions remain distinct. | Keep description conformance with the exchange use; return relation truth, architecture adequacy, evidence, and assurance to their direct patterns. |
BA-5 | Reused or live descriptions name source-to-use, source-return when stronger use needs it, description freshness, and publication-currentness objects appropriate to the claim. | Apply G.11; do not turn freshness, synchronization, recent publication, or live data into grounding, truth, evidence sufficiency, or architecture adequacy. |
BA-6 | Digital and physical objects retain kinds, identities, coupling relations, Work, and transformations; actual change is cited only with the full A.3.4 basis. Project-local use additionally names both composite Work and the obtaining project-use relation. | Recover model, systems, epistemes, the composite U.Work, interfaces, coupling, changed referent and facts, and builtAssetDescriptionProjectUseRelationRef as the separately governed obtaining relation by which this description use concerns that Work before making identity, parthood, transformation, or project-locality claims. |
BA-7 | Every used cost, schedule, operation, maintenance, sustainability, or energy view names description identity and, when asserted as a structural view, selected structure, viewpoint, and conformance; its characteristic, Work, temporal, causal-use, evidence, assurance, and currentness claims keep their subject patterns. | Use C.16 for the measurement result, A.15.1 for Work, C.27.TA or C.27 for the temporal use, C.28 only when the view, telemetry, simulation, maintenance action, or claimed change is used causally, A.10 or B.3 for reliance or assurance, and G.11 for currentness; do not let the auxiliary view itself establish a causal effect, sustainability, acceptance, evidence, assurance, or architecture adequacy. |
BA-8 | An ISO 19650-based use identifies the part and edition, the used information or model edition, and the source’s contribution. Dates, validity windows, refresh and stronger-use return conditions are supplied when the receiving use or regime requires them. | Recover missing grounds for that use; a historical interpretation can retain its named edition. Reconsider affected claims when their source basis changes; do not silently substitute a successor or infer asset facts or authority from the standard’s terms. |
BA-9 | Every use that crosses design-side and run-side material makes its side-specific descriptions, claimed Work, sources, currentness, classification basis and admissible use recoverable; correspondence, coupling, and transformation refs appear only when their direct predicates obtain. BuiltAssetDesignRunSeparationUse can organize these distinctions and any unresolved merge. | Recover the missing content in ordinary wording or the local record, or narrow or block the dependent cross-lifecycle use. Do not restore a generic tag, infer identity or parthood from co-display, or treat telemetry, Work, correspondence, coupling, or a proposed effect as actual A.3.4 change. |
BA-10 | A green twin, dashboard, exchange result, or release screen remains a cue until the required A.21 GateDecisionResult is established for a named gate decision; gate decision, release action, work-entry readiness, permission or grant act, performed Work, and a subject-release predicate remain distinct claims. | When a named gate decision is current, establish or recover its GateDecisionResult, applicable profile application and check-application results; use publication and the optional DecisionLog under A.21:4.10 only when those uses are current. Route a release action or other performed Work to its A.15.1 occurrence, readiness to A.15.5, a permission result or exercise to A.2.8.PER, an instituting or revoking grant act to A.2.9, and a subject-release claim to its named predicate and participants or A.6.RCD missing-governor; none is entailed by freshness, evidence, assurance, the display, or a GateDecisionResult with decisionValue=pass. |