Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

C.30.AD.BA:3 - Worked Cases

C.30.AD.BA:3.1 - Hospital ventilation and fire compartmentation

A hospital renovation uses an IFC publication, a fire-compartment view, a ventilation flow view, an equipment register, an energy-use view, and live air-handling telemetry. The immediate architecture concern is whether the changed ventilation arrangement preserves smoke-control functions across compartment boundaries. A second intended use is a bounded comparison of air-handling energy consumption; it does not share the smoke-control verdict.

The engineer names the hospital facility as builtAssetRef, recovers the actual subject relations and fire-compartment, ventilation-flow, equipment-module, and control structures, and cites an obtaining ArchitectureRelation only if its C.30 predicate holds. Required or proposed content remains in a bounded architecture claim. Each used architecture description has its ClaimGraph, one EntityOfConcern, and effective reference scheme; each claimed structural view additionally has a viewpoint and independently obtaining E.17.0 conformance relation.

The IFC publication supplies a source-to-use path for the spatial and equipment descriptions while its representation, publication occurrence, form, and carrier stay separate. The telemetry episteme has a currentness boundary and can support separately governed operating-state claims; it is not itself the control structure, an architecture relation, an actual physical transformation, or architecture evaluation.

For the energy use, one current C.16 measurement-result episteme attributes 112 kWh ± 4 kWh electrical-energy consumption to air-handling unit AHU-3 over a declared 24-hour commissioning window. It names the measurand, Characteristic, Scale and unit, method and model, calibration basis, dated measurement Work, time stance, and uncertainty. Its source-to-use path cites the meter telemetry and source edition; its G.11 currentness condition limits use to the named sensor, calibration, model editions, and validity window and reopens that use when one changes.

If the engineer claims that the control revision will reduce the daily consumption rate, the action-guiding temporal claim enters C.27 with the intervention, window, resistance or cost, evidence or assumption relation, supported use, unsupported use, and reopen condition. For the causal claim that the control revision produces the reduction, C.28 additionally governs the causal-use class, support basis, supported use, unsupported use, and verdict. C.27 temporal adequacy does not establish a causal intervention effect, and C.28 does not replace the C.16 measurement result, C.27 temporal claim, or G.11 currentness boundary.

A.10 and B.3 still govern material reliance and assurance. With no comparable baseline given, the reading supplies the reported commissioning-window consumption, not a conclusion that consumption fell. Neither the energy view nor the recent reading proves sustainability, smoke-control adequacy, or architecture adequacy.

An air-handling unit has a product-aspect designation and a location-aspect designation. Each designation use names its scheme, selected structure, designated entity, qualification window, and direct relation when one obtains. A bounded correspondence claim or obtaining correspondence relation lets the maintenance team retrieve both descriptions without making the product structure identical to the location structure.

For the proposed arrangement, identify the compartment boundaries covered by the requirement and establish whether the proposed flow and control structures preserve that function in each required mode. For a decision about a mode, one may establish the same answer for every admissible arrangement, even when a different mechanism supplies the grounds in each. To identify the actual mechanism, distinguish the arrangements whose mechanisms differ. For a claim about the installed system’s capability, establish its actual configuration and grounds for its behavior in the required modes. For an account of a past event, establish which mode and paths were involved then. The separate energy comparison retains its own unit, period and measurement basis.

C.30.AD.BA:3.2 - Bridge inspection twin

A bridge operator combines an as-maintained geometry model, structural-member view, inspection history, strain telemetry, and a simulation view. The bridge remains the built asset across model editions. The structural-member and sensor-placement structures are selected explicitly; each description keeps C.2.1 identity and each claimed view E.17.0 conformance. Inspection and telemetry claims retain their evidence, grounding, source-use, and currentness relations. A revised simulation model retains the same C.2.1 episteme identity when its claim content, EntityOfConcern, and effective reference scheme are unchanged. Otherwise identify another episteme; assert an EpistemeEditionRelation only when its historical-continuation predicate obtains. Assess any declared lineage or continuity claims separately for the intended reuse.

When the operator compares an original design description with the as-maintained geometry, inspection history, and live telemetry, designRunSeparationUse cites the design-side and run-side descriptions, the design, inspection or maintenance Work claimed, the sources and currentness conditions needed by the comparison, and any separately governed design-to-realization correspondence. actualTransformationRefs remains absent unless a repair or other physical change satisfies A.3.4. The architecture description can therefore support a decision to inspect or redesign a connection while retaining the route back to the geometry publication, measurement descriptions, and selected structures. It cannot treat a successful data-exchange check, recent sensor sample, simulation result, polished dashboard, or local design/run classification as proof that the bridge architecture is adequate or that design and realized objects are identical.