C.24:4.7 - Closure and worked cases
Close as a CallPlan when route order and budgeted enactment are the current question. After a bounded route probe, state in the CheckpointReturn whether to probe again, stop, use a previously adopted route whose conditions now hold, or seek the still-required adoption decision. When the action reopens, return to the commission or the corresponding domain prescription, A.15.7 or C.11 decision. Use the applicable neighbouring pattern when pool treatment, selector declaration, readiness, execution or publication becomes the question.
Domain-prescribed action before Work.
In a constructed catalogue-maintenance case, CatalogueMethod_3 requires rebuilding a digest when the catalogue’s source checksum changes. That condition is established; no choice of action remains and the rebuild has not begun. Plan the two admitted Methods directly:
CallPlan:
actionBasis:
domainPrescribedAction:
methodRef = CatalogueMethod_3
prescriptionRef = catalogue_method_v3#changed-source-digest
prescribedAction = rebuild_digest
applicabilityAndStop = changed_source_checksum; stop_if_input_version_changes
objective = digest_for_the_fixed_catalogue_version
plannedCallsInOrder = [ReadCatalogueMethod_2, BuildDigestMethod_4]
plannedBudgetEnvelope = {time<=10_minutes, cost<=catalogue_budget, risk<=read_and_derived_file_only}
stopOrReplan = input_version_changes_or_budget_is_exceeded
nextPlannedAction = confirm_required_entry_permission_then_run_read
The prescription fixes the action, while work-entry permission remains separate. If a permitted route probe is needed, its CheckpointReturn retains this same domainPrescribedAction branch and states the tested Methods, findings, spent/residual budget and next action. A changed prescription or input condition reopens the domain basis. Neither form invents an A.15.7 decision or completed Work.
A.15.7 decision into a known route.
During ongoing repository-repair Work, changed source facts make produce_patch_and_verify the next action under the current repair Method. Using the steering Method in A.15.7, the responsible maintainer makes that decision. The retained decision names the repair agent as intended performer, the changed-source fact, and test failure as the stop and feedback condition. Because the call plan relies on the decision later, the team retains it in one episteme identified under C.2.1. The episteme describes the situation-responsive decision; it is not a C.11 ChoiceResult.
CallPlan:
actionBasis:
situationResponsiveDecisionEpistemeRef = patch_action_decision_17
objective = produce_patch_and_verify
plannedCallsInOrder =
- methodRef = InspectRepositoryMethod_4
methodDescriptionRef = inspect_repo_route_v3
- methodRef = EditCandidateMethod_2
methodDescriptionRef = edit_candidate_route_v2
- methodRef = TargetedTestMethod_7
methodDescriptionRef = targeted_tests_route_v5
plannedBudgetEnvelope = {time<=45_minutes, compute<=x2, cost<=y2, risk<=r2}
stopOrReplan = targeted_tests_fail_twice
nextPlannedAction = enact_now
An actual call needs its independent A.15.1 grounds; add assignment-bound attribution and a trace representation when the receiving use consumes them.
Constructing a route from a fixed result.
The team has accepted a one-off order to deliver this week’s report and obtain the recipient’s acceptance. That commission fixes the action. The team selects how to carry it out. The maintained interface specifies the timestamp unit, the recipient’s week boundary and time zone, and the required report format. Four admitted Methods extract the rows, convert their timestamps, aggregate by week, and render a conforming report. For the specified input size and one sequential performer, they take at most 2, 3, 4 and 1 minutes respectively. The team has 12 minutes.
Work backwards from acceptance. The four calls prepare the report in at most 10 minutes. Their outputs establish that it can be ready to send. The recipient also provides an admitted submission Method. Under its stated conditions it delivers a conforming report and returns the recipient’s acceptance within 2 minutes. The intended performer has access, the receiver is available for the full interval, and the prepared report meets its entry conditions. The five-call plan therefore fits the 12-minute budget. The time bound warrants adopting the plan under the stated conditions. To close the actual job by its deadline, establish when this recipient accepted this report. Acceptance after the deadline means the commissioned job finished late. Delivery itself may have been on time. An undated acceptance can establish receipt and acceptance while leaving timeliness open.
If the export already supplies compatible timestamps, the remaining calls fit in 9 minutes. If the submission service promises only to queue the file within 2 minutes, the team can promise timely submission on that basis. A deadline for recipient acceptance still depends on what happens after queuing.
If the timestamp unit or week boundary is missing, recover that interface or receiving condition from its authoritative source. The magnitude of sample numbers does not establish a unit. A changed report requirement returns to the action basis before replanning.
Unfamiliar route.
In this constructed repair case, ci_route_choice_09 fixes the action: produce a candidate patch and run the targeted tests. The proposed ci_patch_plan_09 orders EditCandidateMethod_2 and TargetedTestMethod_7, has an upper duration bound of 25 minutes, and stops for replanning if the reproduction changes or the tests fail twice. Adoption here requires a supported guarantee that the repair fits the enactment time left after route probing.
Before adopting that plan, the maintainer probes whether the failure can be reproduced reliably enough to guide the patch. For this case, MinimalReproductionMethod_5 requires the same failure in two consecutive runs on the fixed repository revision, with the trace and reproduction evidence collected on that revision. One such run has completed. The enactment budget covers both this route probing and the planned repair.
CheckpointReturn:
actionBasis:
fixedOptionChoiceResultRef = ci_route_choice_09
objectiveOrTaskFamily = unfamiliar_ci_failure
testedMethodRefs = [LogTraceMethod_2, MinimalReproductionMethod_5]
evidenceRefs = [trace_result_1, reproduction_result_1]
burnedBudget = 15_minutes
residualBudget = 30_minutes
recommendedNextAction = repeat_minimal_reproduction_then_return_for_checkpoint_decision_on_ci_patch_plan_09
commitTrigger = reproduction_is_stable_and_required_evidence_is_current
If the repeat establishes the trigger, the maintainer decides whether to end route probing and adopt ci_patch_plan_09: produce the patch, then run its targeted tests. The maintainer compares the time remaining after that repeat with the plan’s 25-minute upper duration bound and checks the applicable safety or assurance conditions.
A 3-minute repeat leaves 27 minutes, which covers that bound. A 6-minute repeat leaves 24 minutes, so the current bound does not establish the required guarantee. A tighter justified bound for the same route, a qualified alternative route or an independently permitted budget revision may establish fit; otherwise stop.
If the plan is adopted, the repair agent may start its first call only with the required work-entry permission. The checkpoint itself records neither that permission nor a performed call.
Two vendor routes with one token.
Vendor A and Vendor B both publish a route called search. vendor_a_search_v2 states scheme VendorA API, edition 2026-07, intended use repository text search, and selected Method RepositoryTextSearchMethod_3. vendor_b_search_v5 states scheme VendorB agent tools, edition 2026-08, intended use web source retrieval, and selected Method WebSourceRetrievalMethod_8. The shared token identifies neither binding; the description fields do. An executable adapter, if used, remains distinct from the Method it implements, and its execution remains separate Work.
Scale comparison, when current.
The cheap C.19.1 probe for BatchSearchMethod_3 and IndexedSearchMethod_6 returns bounded scale comparison for the same repository-search task and 10k–100k files window. The comparison then uses elapsed time and missed-match rate from repo_search_benchmark_12, including uncertainty and cost limits, and warrants a preference for IndexedSearchMethod_6 only inside that window.
If the evidence for one Method covers only small text files and the evidence for the other covers only large mixed repositories, the task difference leaves their relative performance on the receiving workload open. Return no scale-based preference. A tie-break written for established equivalent performance does not apply to that finding. The project can use a local policy that covers the actual case or seek a waiver when overriding a preference that would otherwise decide the use.
Near misses. A route label with no recovered Method remains probe material. A plan with no Work is still intent. A trace row does not prove performer, assignment, Method, or service acceptance. If the holder reserved a fresh decision, a satisfied commitTrigger still leaves adoption open. A standing conditional adoption can already settle the route when its terms hold.
Transfer examples. The same result shape works for research assistance, program repair, and lab automation. The Methods and safety conditions differ; the plan/checkpoint boundary does not.