Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

C.24:4.6 - Public quick card

An ordinary written plan can supply this content; the schemas above are optional forms. Retain an existing applicable plan when it already states:

  • the operative grounds fixing the action, its objective, and the ordered Method refs. These grounds may come from a commission, a domain prescription, an A.15.7 decision or a C.11 choose now result;
  • route-description refs only when needed, with their source scheme, exact edition, intended use, and selected Method binding;
  • dependencies, the simultaneous availability of jointly required services, safe parallelism and any earlier result that governs which later call can be made, when these change the route;
  • applicable time, compute, cost or risk budgets, with stop and replan conditions;
  • next planned action; and
  • an exact C.19 or C.19.1 result, B.3 assurance result, causal-use result, provenance ref, or named domain-constraint result only when that branch is current.

This is enough for an ordinary plan. Do not fill the heavier branches merely to make the record look complete.