Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

B.1.6:8 - Common Anti-Patterns and How to Avoid Them

OverreadRepair
A method or algorithm is treated as the work-resource roll-up.Recover the resource claim and its grounds through B.1.6. Use A.3.1 for a separate Method question, or A.3.2 for a MethodDescription membership or description-use question.
A work plan is treated as measured work.Use A.15.2 for the plan and A.15.1 for performed work evidence.
A phase label or timeline is treated as a resource ledger or as proof of a Work relation.Recover the subject first: A.15.1 for Work temporal parts or occurrences, the carrier’s identity pattern plus A.14 for proper non-Work PhaseOf, and B.1.4 only for bounded aggregation of already recovered temporal relations. Add B.1.6 only when typed resource values are being aggregated.
A resource gain is treated as emergence.Use measurement and evidence-use patterns first; use B.2 when whole identity remains the question; use B.2.P for unresolved emergence-family wording.
A ledger, dashboard or report total is relied on without the grounds its use requires.Identify what establishes the value for the required boundary and period. A warranted whole-boundary reading can settle a total. Recover component records, relations and combining rules where the result or its required explanation depends on them. Preserve an adequate account; obtain only missing grounds under §§4–5. An asserted dated aggregation Work or a needed replayable provenance account retains its requirements.