Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

B.1.6:7 - Conformance Checklist

IDRequirement
CC-B1.6-1Every resource component names its Characteristic, Scale, applicable Unit, subject, time stance and attribution basis, with uncertainty relevant to use. A claimed performed measurement retains its C.16 Work and result; an estimated or derived value retains its sources, model and conditions.
CC-B1.6-2Included accounting subjects and each relation used by the aggregation are independently grounded. A class or boundary rule may establish coverage. Each individual occurrence attribution or A.15.1 Work-part relation used has its basis; temporal overlap follows C.27.TA, resource-use or stock overlap follows its rule, and an included non-Work phase satisfies its carrier’s identity and PhaseOf conditions.
CC-B1.6-3The operative policy names inclusion and output kind, every additional rule needed to interpret or justify the result, and an edition when the result or use depends on it.
CC-B1.6-4For dated aggregation Work, A.13 identifies the performer and A.15.1 independently admits the occurrence. F.6 is present only when the result must also identify the assignment under which that Work was performed. The Method, direct/A.6.1 bindings, resources, and temporal extent remain separate.
CC-B1.6-5A design explains input selection and the warranted output for the requested class. A claimed application supplies its typed aggregation result and grounds. When a claim-bearing result episteme is needed, its claim content, EntityOfConcern and effective ReferenceScheme are identified through C.2.1. The resource value, claim content, episteme and expression remain distinct.
CC-B1.6-6Sources and derivations needed for the result are recoverable. Any required A.10/G.6 provenance account or G.11 currentness result remains separate from the measurement and aggregation results.
CC-B1.6-7Planned values and A.15.5 resource readiness are not presented as measured performed-work aggregation.
CC-B1.6-9Any yield, efficiency, comparison, assurance, transformation, whole-reidentification or decision claim names its applicable subject pattern.