A.2.6:20.1.2 - Source term comparisons
| # | Context / Source | Local label(s) (native) | Closest USM concept | Notes on fit & deltas |
|---|---|---|---|---|
| 1 | ISO/IEC/IEEE 42010:2022, published scope | Architecture description; entity of interest; architecture viewpoints; model kinds | Context slice and Scope for a selected applicability question | 42010 specifies the structure and expression of architecture descriptions. A claim recorded in such a description may have a USM scope; construct its slices and predicate from that claim’s conditions. A viewpoint does not by itself identify those values. |
| 2 | OMG Essence 1.2 | Alpha State; Work Product; LevelOfDetail; EntryCriterion; CompletionCriterion | D for information detail; ESG for claim-use conditions in state transitions; A.2.5 for assignment-state conditions used in RSG; Scope for applicability | Entry and completion criteria test an alpha state or work-product level of detail. Keep the information-detail aspect of LoD with D. Reuse a checklist condition in ESG or RSG only after identifying its claim-use or assignment-state meaning. Scope requires a separate condition delimiting applicable slices. |
| 3 | NIST AI RMF 1.0, §3.1 and §5.2/MAP | Context of use; targeted application scope; validity, reliability, robustness; monitoring | Claim scope (G) for specified applicability conditions; performance measures and reliance grounds remain distinct | MAP places application scope within purposes, settings, affected people and risks. Extract conditions for the claim’s scope predicate; preserve performance/risk assessment and monitoring. Interpret validity-related claims by content, and keep the source’s performance reliability distinct from FPF R. |
| 4 | FDA final guidance (2023), §IV and §VI.A; ASME V&V 40–2018 definitions reproduced there | Context of use; model risk; credibility; verification and validation | Claim scope (G) for extracted applicability conditions; R for justified reliance | The COU also states the model’s role in answering a question and its use with other evidence. Preserve that decision relation when expressing applicability as a scope. Credibility is assessed for that use and its model risk; scope membership alone does not establish it. |
| 5 | W3C SHACL §2.1.2–2.1.3; SHACL-AF §3 | Shapes; focus nodes; targets (sh:targetClass; AF sh:target); constraints | Target selection provides an analogy for delimiting applicability; F concerns expression properties | SHACL targets produce RDF terms to validate; constraints determine their conformance. A USM scope contains declared U.ContextSlice values. Identify those slices and their membership predicate before using the analogy; target selection alone does not establish that a claim holds. C.2.3 assesses the expression properties. |
| 6 | OWL 2 Direct Semantics and Structural Specification, Second Editions | Class extension; intersection/union; property domain/range; imports; version IRI | Set extension as an analogy for scope algebra; ontology editions as selectors or interpretation inputs when applicable | Class extensions supply sets; property domain/range axioms imply membership of property-pair ends in specified classes or data ranges. Construct the corresponding USM slice domain independently. Imports supply ontology dependencies; version IRIs identify editions. An edition enters the slice when claim applicability depends on it; otherwise retain a required edition in the interpretation basis. |
| 7 | IETF BCP 14: RFC 8174 | MUST/SHALL/SHOULD; requirements language | Requirement strength in normative guard statements | BCP 14 defines the special meanings of its uppercase requirement keywords. The observable, deterministic membership conditions are USM requirements; they do not follow from those keywords alone. |
| 8 | FAA AC 20-115D on DO-178C, DO-333 and DO-330 | Software level; formal-methods supplement; tool qualification level (TQL); life-cycle objectives and evidence | F for expression and proof properties; R for justified reliance; scope kind follows the bounded claim or capability | The software level selects applicable objectives; the formal-methods supplement and tool qualification address distinct assurance work. A condition on a software or tool claim can delimit Claim scope, while a capability’s operating conditions can delimit Work scope. Neither a level label nor a method name supplies the resulting FPF scope or assurance judgement. |
| 9 | ISO 26262:2018, published scope summaries | Item definition; hazard analysis and risk assessment; functional safety concept; ASIL-oriented analyses | Claim scope or Work scope for stated applicability conditions | An operating situation or mode can supply a selector when it changes applicability of the receiving claim or capability. Item definition and safety analysis also determine domain requirements. Preserve those requirements and their evidence; an ASIL label alone supplies neither a scope nor a measured value of FPF R. |
| 10 | IEC functional-safety overview; HSE control-systems explanation | Safety function; SIL; demand/continuous mode; proof-test interval | Claim scope or Work scope for stated operating conditions; performance requirements and reliance grounds remain distinct | SIL specifies safety-integrity requirements. A proof-test interval affects the basis of a failure-probability claim, so it cannot be reduced to evidence age. State which operating or maintenance condition bounds applicability and which support condition must hold before reliance. |
| 11 | ACM artifact badging, PADS 2022 and CCS 2025 | Available; Evaluated—Functional/Reusable; Results Reproduced/Replicated | Evidence relevant to R; Context slice when the evaluated environment is explicitly identified | The badges distinguish availability, artifact assessment and independent result checks. Use the badge criteria, checked claim and environment when assessing support; the badges do not form a single FPF warrant scale. An environment description supplies slice selectors only when their schema and values are made explicit. |
| 12 | Google SRE, “Service Level Objectives” | SLIs; SLOs; measurement windows; workload classes; error budgets | Performance measures; Claim scope or Work scope for stated service conditions | Keep metric definitions and aggregation windows with their measures. A workload class or region enters a scope when it changes applicability. In a USM rollout example, gammaTime enters scope only when crossing the declared start or end changes membership; an error-budget window alone does not establish that boundary. |
These comparisons suggest two useful questions: which conditions matter to the receiving use, and under which of them the claim or ability applies. A.2.6 answers them with independently identified slices and set-valued scopes. Choose Claim scope or Work scope from what is being bounded; the source term alone does not choose the scope kind. Preserve the source’s decision relation, performance measures, safety requirements and evidence where the receiving use depends on them. Any relied-on translation follows §7.5.