Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

A.2.6:20.1 - SoTA-Echoing - Source distinctions and scope terminology

Intent. This annex compares USM terms with usage in the sources below and explains the Unified Tech and Plain names used in A.2.6.

A.2.6:20.1.1 - Comparison basis

Compared sources and the passages used here:

  1. ISO’s published scope for ISO/IEC/IEEE 42010:2022, Software, systems and enterprise — Architecture description.
  2. OMG Essence 1.2, October 2018, §9.3.3.5–9.3.3.7 and §9.3.4.9–9.3.4.11.
  3. NIST AI 100-1, AI RMF 1.0, January 2023, §3.1 and §5.2/MAP.
  4. FDA, Assessing the Credibility of Computational Modeling and Simulation in Medical Device Submissions, final guidance, 17 November 2023, §IV and §VI.A, including definitions attributed there to ASME V&V 40–2018.
  5. W3C SHACL, Recommendation, 20 July 2017, §2.1.2–2.1.3; SHACL Advanced Features, Working Group Note, 8 June 2017, §3.
  6. W3C OWL 2 Second Editions, Recommendations, 11 December 2012: Direct Semantics, §2.2–2.2.3 and §2.3.2–2.3.3; Structural Specification and Functional-Style Syntax, §3.1–3.4.
  7. IETF BCP 14: RFC 2119, March 1997, as clarified by RFC 8174, May 2017, §2.
  8. FAA AC 20-115D, 21 July 2017, §1, §4, §6, §8 and §10, describing use of RTCA DO-178C, DO-333 and DO-330 (13 December 2011).
  9. ISO’s published scope summaries for ISO 26262 Part 1: Vocabulary, Part 3: Concept phase and Part 9: ASIL-oriented and safety-oriented analyses, second editions, December 2018.
  10. IEC’s Overview of IEC 61508 & Functional Safety, 2022, slides 9–18, alongside its IEC 61508-1:2010 edition 2 description; HSE’s older Control systems, “Proof testing”, for the effect of test intervals on a failure claim.
  11. ACM Artifact Review and Badging v1.1 as applied in SIGSIM PADS 2022 and CCS 2025, “Evaluation Criteria and Badges” and “Packaging Artifacts”.
  12. Google, Site Reliability Engineering, Chapter 4: “Service Level Objectives”, especially “Standardize Indicators” and “Defining Objectives”.

Terms compared: U.ContextSlice, generic Scope and set algebra, Claim scope (G), Work scope, Bridge plus a separate bounded-use claim and reliance basis, Γ_time, widen, narrow, refit, translate, SpanUnion, serial intersection, separation from F and R, and avoidance of overloaded validity and operation terms.

A.2.6:20.1.2 - Source term comparisons
#Context / SourceLocal label(s) (native)Closest USM conceptNotes on fit & deltas
1ISO/IEC/IEEE 42010:2022, published scopeArchitecture description; entity of interest; architecture viewpoints; model kindsContext slice and Scope for a selected applicability question42010 specifies the structure and expression of architecture descriptions. A claim recorded in such a description may have a USM scope; construct its slices and predicate from that claim’s conditions. A viewpoint does not by itself identify those values.
2OMG Essence 1.2Alpha State; Work Product; LevelOfDetail; EntryCriterion; CompletionCriterionD for information detail; ESG for claim-use conditions in state transitions; A.2.5 for assignment-state conditions used in RSG; Scope for applicabilityEntry and completion criteria test an alpha state or work-product level of detail. Keep the information-detail aspect of LoD with D. Reuse a checklist condition in ESG or RSG only after identifying its claim-use or assignment-state meaning. Scope requires a separate condition delimiting applicable slices.
3NIST AI RMF 1.0, §3.1 and §5.2/MAPContext of use; targeted application scope; validity, reliability, robustness; monitoringClaim scope (G) for specified applicability conditions; performance measures and reliance grounds remain distinctMAP places application scope within purposes, settings, affected people and risks. Extract conditions for the claim’s scope predicate; preserve performance/risk assessment and monitoring. Interpret validity-related claims by content, and keep the source’s performance reliability distinct from FPF R.
4FDA final guidance (2023), §IV and §VI.A; ASME V&V 40–2018 definitions reproduced thereContext of use; model risk; credibility; verification and validationClaim scope (G) for extracted applicability conditions; R for justified relianceThe COU also states the model’s role in answering a question and its use with other evidence. Preserve that decision relation when expressing applicability as a scope. Credibility is assessed for that use and its model risk; scope membership alone does not establish it.
5W3C SHACL §2.1.2–2.1.3; SHACL-AF §3Shapes; focus nodes; targets (sh:targetClass; AF sh:target); constraintsTarget selection provides an analogy for delimiting applicability; F concerns expression propertiesSHACL targets produce RDF terms to validate; constraints determine their conformance. A USM scope contains declared U.ContextSlice values. Identify those slices and their membership predicate before using the analogy; target selection alone does not establish that a claim holds. C.2.3 assesses the expression properties.
6OWL 2 Direct Semantics and Structural Specification, Second EditionsClass extension; intersection/union; property domain/range; imports; version IRISet extension as an analogy for scope algebra; ontology editions as selectors or interpretation inputs when applicableClass extensions supply sets; property domain/range axioms imply membership of property-pair ends in specified classes or data ranges. Construct the corresponding USM slice domain independently. Imports supply ontology dependencies; version IRIs identify editions. An edition enters the slice when claim applicability depends on it; otherwise retain a required edition in the interpretation basis.
7IETF BCP 14: RFC 8174MUST/SHALL/SHOULD; requirements languageRequirement strength in normative guard statementsBCP 14 defines the special meanings of its uppercase requirement keywords. The observable, deterministic membership conditions are USM requirements; they do not follow from those keywords alone.
8FAA AC 20-115D on DO-178C, DO-333 and DO-330Software level; formal-methods supplement; tool qualification level (TQL); life-cycle objectives and evidenceF for expression and proof properties; R for justified reliance; scope kind follows the bounded claim or capabilityThe software level selects applicable objectives; the formal-methods supplement and tool qualification address distinct assurance work. A condition on a software or tool claim can delimit Claim scope, while a capability’s operating conditions can delimit Work scope. Neither a level label nor a method name supplies the resulting FPF scope or assurance judgement.
9ISO 26262:2018, published scope summariesItem definition; hazard analysis and risk assessment; functional safety concept; ASIL-oriented analysesClaim scope or Work scope for stated applicability conditionsAn operating situation or mode can supply a selector when it changes applicability of the receiving claim or capability. Item definition and safety analysis also determine domain requirements. Preserve those requirements and their evidence; an ASIL label alone supplies neither a scope nor a measured value of FPF R.
10IEC functional-safety overview; HSE control-systems explanationSafety function; SIL; demand/continuous mode; proof-test intervalClaim scope or Work scope for stated operating conditions; performance requirements and reliance grounds remain distinctSIL specifies safety-integrity requirements. A proof-test interval affects the basis of a failure-probability claim, so it cannot be reduced to evidence age. State which operating or maintenance condition bounds applicability and which support condition must hold before reliance.
11ACM artifact badging, PADS 2022 and CCS 2025Available; Evaluated—Functional/Reusable; Results Reproduced/ReplicatedEvidence relevant to R; Context slice when the evaluated environment is explicitly identifiedThe badges distinguish availability, artifact assessment and independent result checks. Use the badge criteria, checked claim and environment when assessing support; the badges do not form a single FPF warrant scale. An environment description supplies slice selectors only when their schema and values are made explicit.
12Google SRE, “Service Level Objectives”SLIs; SLOs; measurement windows; workload classes; error budgetsPerformance measures; Claim scope or Work scope for stated service conditionsKeep metric definitions and aggregation windows with their measures. A workload class or region enters a scope when it changes applicability. In a USM rollout example, gammaTime enters scope only when crossing the declared start or end changes membership; an error-budget window alone does not establish that boundary.

These comparisons suggest two useful questions: which conditions matter to the receiving use, and under which of them the claim or ability applies. A.2.6 answers them with independently identified slices and set-valued scopes. Choose Claim scope or Work scope from what is being bounded; the source term alone does not choose the scope kind. Preserve the source’s decision relation, performance measures, safety requirements and evidence where the receiving use depends on them. Any relied-on translation follows §7.5.

A.2.6:20.1.3 - Scope names and their use
A.2.6:20.1.3.1 - Selected names (normative)
Concept in A.2.6Unified Tech (lexicon)Unified Plain (manager‑friendly)Allowed short formAvoid / unpack
Addressable evaluation contextU.ContextSliceContext sliceSlice (when local)“domain” (as guard input), “latest” time
Extensional scope valueU.ScopeScope—“applicability”, “envelope”, “validity” (as characteristic names)
Claim applicabilityU.ClaimScope (*nick G)Claim scopeG“generality”, “applicability/envelope (of claim)”
Capability applicabilityU.WorkScopeWork scope—“capability envelope”, “operational applicability”, “operation scope”
Time selectorΓ_timeTime selector—implicit “latest”
Exact local-sense translationObtaining F.9 Bridge + separate affirmative C.2.1 use claim + current A.10 or B.3 relianceBridge, translation rule and tolerance, checked reliance—automatic Bridge use or treating a loss score as permission
Coverage by casesSet union of supported scopesCases covered under the stated premisesinferring independent evidence from different cases
Independent parallel supportSpanUnionUnion of independently supported areasomitting an essential shared premise
Joint requirements on a common sliceIntersectionSlices meeting all required conditionsintersecting the input of one stage with the output of another before relating them
Scope editsΔG+ (widen), ΔG− (narrow), Refit, TranslateWiden, narrow, refit, translate—implicit widening
Optional didacticsDetail (D), KindAT for the intended treatment of a kindDetail and kind abstraction tierD / ATestablish scope separately from either annotation

Naming rationale:

  • “Scope”. This name designates the extension over independently identified slices; domain words such as “envelope” or “validity” require interpretation before that designation is warranted.
  • “Claim scope” vs “Work scope”. These names distinguish claim uses and capability uses of the common set-valued scope notion.
  • G names Claim scope in the F–G–R triple.
  • “Context slice” keeps the evaluation target addressable through its exact declared selector schema and values; one membership predicate may inspect only a projection without reidentifying the slice.
A.2.6:20.1.3.2 - Wording membership and scope changes
  • Use “Claim scope (G) covers TargetSlice” and “Work scope covers JobSlice” in guards.
  • When time changes membership, name exact gammaTime and its membership boundary; never say “latest.” A time-independent predicate need not inspect gammaTime, but keep every selector already declared in the slice.
  • When combining scopes, say which conditions apply to the same input, which reachable outputs must meet the next conditions, and which cases cover the claimed area. Reserve SpanUnion for independently supported lines.
  • When exact local-sense translation is current, say: “through an obtaining F.9 Bridge and a separate affirmative C.2.1 claim for this direction, rule, and tolerance; rely on it only through the current A.10 or B.3 branch, then evaluate membership on the returned scope.”
  • When widening or narrowing, write “ΔG+ / ΔG−”. If support for the affected slices changed, say what support was gained or lost. Use “Refit” for unit/parameter normalization only when the exact scope extension is preserved.
A.2.6:20.1.3.3 - Source-phrase comparison summary

Use these conditional paraphrases with the source distinctions in §20.1.2.

Local source phraseUse in USM wording
“Context of use” (NIST, FDA/ASME)Extract a particular claim’s applicability conditions into G on stated slices; preserve the wider decision context.
“Operating modes/situations”May supply selectors for Claim scope or Work scope, according to what is bounded; retain performance and qualification conditions.
“Target” (SHACL)Selects RDF terms for validation. Construct any corresponding slice domain and scope predicate separately.
“Class extension; property domain/range; imports/version” (OWL)Class sets supply an analogy; property axioms, ontology dependencies and edition identity keep their own meanings. Construct the corresponding Context slices separately.
“Architecture view context” (42010)Locate the claim and its conditions, then construct the relevant slice and scope; the view’s organization does not determine them.
“Capability envelope” (safety documents)Work scope when it delimits a capability’s job slices, with performance and assurance requirements retained separately.
“Domain” (informal)Unpack the intended conditions into declared selectors and a predicate before using them in a scope guard.