A.19.SPR:5.2 - Work-entry readiness is not gate passage
Before: “Release 12 is ready.”
After: “At 10:00, the A.15.5 check found that PlanItem-Deploy-12 satisfied its release-entry criterion and was ready for work entry until 10:30; recheck if a required input changes.”
For replay, make the plan item, criterion, input facts, result and reliance window recoverable. Identify a separate result episteme or checking Work only when that identity matters; a claimed Work needs its A.13 basis and independent A.15.1 admission, with F.6 only for assignment-bound attribution. The work-entry finding alone establishes no gate passage. Use A.21 for a distinct OperationalGate(profile) that consumes declared checks and publishes its own decision.