A.19.SPR:5 - Worked examples
Each example starts with wording for the stated use; §4 determines which further details are needed.
A.19.SPR:5.1 - Physical-system state
Before: “Pump 37 is in a good operating state.”
After: “Pump 37 satisfies InspectionOperatingCondition: its coolant temperature is 72 °C, within the 60–80 °C band, and its discharge pressure is 315 kPa, above the 300 kPa minimum.”
For a relied-on inspection decision, make the measurement basis and applicable condition recoverable. Add the reading time, condition edition and recheck condition when the decision depends on them.
A.19.SPR:5.2 - Work-entry readiness is not gate passage
Before: “Release 12 is ready.”
After: “At 10:00, the A.15.5 check found that PlanItem-Deploy-12 satisfied its release-entry criterion and was ready for work entry until 10:30; recheck if a required input changes.”
For replay, make the plan item, criterion, input facts, result and reliance window recoverable. Identify a separate result episteme or checking Work only when that identity matters; a claimed Work needs its A.13 basis and independent A.15.1 admission, with F.6 only for assignment-bound attribution. The work-entry finding alone establishes no gate passage. Use A.21 for a distinct OperationalGate(profile) that consumes declared checks and publishes its own decision.
A.19.SPR:5.3 - Source use and currentness
Before: “The source posture is good.”
After: “This review uses edition E7 for decision question Q. Reconsider that choice if the question or the source content needed to answer it changes.”
When the decision relies on a claim from E7, assess that claim’s currentness under B.3.4 using the premises and time limits that matter to this use. Preserve source and result identities when the receiving operation depends on them.
A.19.SPR:5.4 - Other repairs
- Evidence. Reliance on claim C remains unestablished because the required calibration basis is missing. If the recipient needs to decide now whether that basis is established, this can settle the question. When further work depends on relying on C, establish who can supply the basis and assess it when available. Add evidence and currentness references when the receiving decision uses them.
- Publication. Replace “publication posture allows decision input” with “This publication exposes candidate input X for the decision; the decision rule still evaluates X.”
- Mathematical lens. Keep
LensUseBoundaryValuein C.29 when its possible values and intended lens use are defined. State what the value permits for the intended lens use under C.29. - Temporal claim. For a C.27 classification, name the temporal claim and its Dyn0, Dyn1 or Dyn2 reading. State the supported use; add the intervention account only when the claim is intervention-sensitive.
- Project-side state. Keep current framework-development status in its project record. Retain reusable guidance and worked examples that help the reader handle project status in the pattern’s stated practice.