A.15.PROD:5.5 - PumpSkid assembly before PumpSkid identity
Actual Work and change. Mounting, wiring, fluid-connection, and whole-configuration changes may each be independently identified under A.3.4, and work parts may be grounded under A.15.1.
Inception basis. Apply the PumpSkid identity rule to the candidate configuration at the relevant boundaries. To date first existence, establish the first satisfaction within the stated history or report the bound that history supplies. To attribute inception to the named assembly Work, also establish its relation to the changes and their role in first satisfying the identity rule. If those links remain open, retain the supported timing conclusion.
Transformation-composition boundary. A claim that additionally requires positive composite-transformation identity or transformation parthood stops at missing-governor[transformation-composition]. Work or method decomposition supplies no proof of transformation decomposition.