Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

A.15.PROD:5.4 - Pressure adjustment without entity inception

Work, Method, and change. A dated pressure-adjustment Work occurrence may enact a pressure-adjustment method, while A.3.4 independently identifies a pressure transformation.

Work-to-change claim. Use the direct subject predicate or a sufficient local compound rule relating the Work and transformation. When its applicability conditions and case facts establish the relation, state the positive claim.

If neither rule is available, keep the two occurrences separately identified and return missing-governor[pressure-work-to-change]. An unavailable deciding fact yields missing-information; under an applicable rule, sufficient facts that fail the positive test yield factually unsupported. Report known inapplicability separately.

A negative claim additionally needs the applicable non-obtaining criterion or complete closure basis under §4.4.

Stop. If the affected vessel or process already exists and no production-completion criterion is current, the result records the Work, the transformation, and their obtaining Work-to-change predicate. The production-work-participation, entity-inception, and completion branches remain unopened.