A.15.5:5.3 - Release screen with separate readiness, gate, and permission windows

At 10:00 UTC on 2026-07-27, the evaluator applies ReleaseEntryCriterion-E3 to ReleasePlan-E7 and PlanItem-Deploy-12. The result says ready for reliance only in [10:00, 10:30) and requires recheck when a consumed source, resource, assignment, permission or gate input changes. All times below use UTC on that date.

At 10:05, the current A.21 application of profile Release-Core-E4 consumes that readiness result through one identified GateCheckApplicationResult, cited by its GateCheckRef, among the complete effective check set. The gate returns a GateDecisionResult with decisionValue=pass for [10:05, 10:20); DecisionLogRef=ReleaseGateLog-12 cites the separate log recording that result. That gate result is not the readiness result and does not institute permission.

Separately, A.2.8.PER GrantedPermissionRelation@Context occurrence DeployGrant-12 covers the named beneficiary and deployment action for [09:00, 11:00). DeployNonProhibitionFinding-E2 reports nonProhibited from its named current frame, explicitly complete for this use, in evaluation window [10:00, 10:15); it is not the grant. A PermissionNormConflictFinding@Context, if an incompatible current norm is established over the same content and window, would be a third permission-side input and an unresolved disposition would stop the use. A policy that requires readiness, gate passage, a current grant, and the frame-relative non-prohibition result may rely on those distinct inputs at 10:10; it must re-evaluate the relevant branch when any window ends or a conflict appears. None of them proves that deployment Work occurred. A.15.1 identifies that Work only after its dated occurrence basis obtains.

If a dashboard shows green but the required readiness result or its reliance window, the current A.21 profile application and gate result, or the required permission value and qualification window cannot be recovered, resolve the missing basis under its subject pattern before relying on the affected claim. Recover the gate result directly or through ReleaseGateLog-12; loss of the log alone need not block reliance on a fully recoverable result. Open the A.10 evidence-provenance and currentness question when that basis for a consumed claim is unresolved.