A.15.5:5 - Archetypal Grounding - Worked Slices
The following constructed cases stipulate their project facts and illustrate the separate readiness, occurrence and reliance questions.
A.15.5:5.1 - Fixture deformation test
Situation. An accepted cooling-fixture ProblemCard has been carried through E.18.1 into WorkPlan-LAB-043 : U.WorkPlan; that P2W carry-through creates neither readiness nor target Work. Its PlanItem-TEST-043 designates possible future performance planned-fixture-deformation-test-043, classifies the intended work as fixture-deformation testing under the plan’s current scheme, selects FixtureDeformationTestMethod-E2 : U.Method, and relies on FixtureDeformationTestProcedure-E5 : U.MethodDescription with that admitted Method as its exact EntityOfConcern and substantive setup-limit claims under A.3.2. The plan records specimen and instrument choices labeled SFI-043. To use them as A.15.3 planned-filling rows, recover the selected declaration, its members and their actual-use conditions; until those are recovered, retain the ordinary plan choices and leave their declaration-local filling interpretation unresolved. The plan also records planned resource reservation FixtureBayReservation-043 and intended performer-system and FixtureTestTechnicianSystemRole conditions. These choices remain content of this WorkPlan.
FixtureTestEntryCriterion-E2 requires, for the proposed 09:00–09:30 UTC start window on 2026-07-27, a resolved specimen identity, heat-flow invariant claim, boundary-condition plan, sensor-calibration result, selected fixture-drawing edition, resource-availability claim, and fixture-test-technician assignment, all current for this use. FixtureTestTechnicianAssignment is a directly declared U.SystemRoleAssignment species. It defines the holder and assigned-kind positions, uses FixtureTestSystemRoleKindDomain, requires FixtureTestTechnicianSystemRole, and applies to this laboratory test. Its obtaining occurrence FixtureTestTechnicianAssignment-043 has FixtureTechnicianSystem-043 as holder and covers the proposed start window. SFI-043 preserves the planned specimen and instrument choices; their actual preparation or use needs its own facts. The calibration result, its A.10 evidence path and currentness result, and the E.17 drawing-edition publication use remain separate inputs. The criterion explicitly treats known expiry or a recorded unresolved required-input status as failure and returns notReady. If the input or its status cannot be determined and no such failure is established, return unknown. A change to a consumed input, assignment coverage, resource availability or start window reopens the affected readiness conclusion; unchanged applicable input results remain reusable.
LabMetrologySystem-2 and LabOperationsCoordinatorSystem-1 are independently admitted Systems. For this constructed case, CalibrationCheckingSystemRole requires condition-sensitive calibration checking, and ReadinessCheckingSystemRole requires selection of readiness/preparation actions against the entry criterion; the stipulated observations support both classifications for this checking scope and window. The directly declared LabMetrologyAssignment and LabOperationsCoordinationAssignment species establish their holder/kind meanings, and case facts make RA-LabMetrology-2-E7 and RA-LabOperationsCoordinator-1-E4 obtain for those Systems and local kinds throughout 08:40–08:50 UTC on 2026-07-27.
The performance history identifies candidate occurrences CalibrationCurrentnessCheck-043 during 08:40–08:45 and FixtureEntryReadinessCheck-043 during 08:46–08:50 on that date, following CalibrationCurrentnessCheckMethod-E1 and FixtureEntryReadinessEvaluationMethod-E2 respectively. For each complete candidate, this constructed case stipulates the independently established A.1:4.2 construction. The local LabCheckingWorkOccursWithinService@LAB043 declaration requires the complete checking occurrence to lie within admitted LabQualityServiceSystem-043’s declared calibration/readiness-checking boundary throughout its checking interval; the stipulated performance histories satisfy that condition. Together with each performer’s established A.13 basis, these premises admit both candidates under A.15.1. Their typed enactsMethod and containing-System relations then obtain on those same grounds. Their separate F.6 attributions use the same obtaining assignments and the case’s Work-assignment facts. Neither is the intended fixture test.
For this constructed case, the laboratory defines two local evaluation-result predicates. calibrationExpiryReported(W, X, T) holds when W’s actual performer compares calibration result X’s governing validity end with T, determines that it is no later than T, and completes that check by reporting expired. fixtureReadinessReturned(W, R) holds when W’s actual performer evaluates the named plan item and proposed start window under FixtureTestEntryCriterion-E2, using the identified input facts, and completes that check by reporting R as its readiness verdict. Each claim concerns one terminal report in one checking episode; a recheck is another episode.
The constructed history stipulates that the calibration result’s validity ended at 08:30 UTC on 2026-07-27. During CalibrationCurrentnessCheck-043, LabMetrologySystem-2 makes that comparison and reports expired at 08:45. During FixtureEntryReadinessCheck-043, LabOperationsCoordinatorSystem-1 evaluates PlanItem-TEST-043 in WorkPlan-LAB-043 for the proposed 09:00–09:30 start window. It uses the established calibration expiry and the recorded unresolved drawing-edition status, applies the criterion’s explicit failure rule, and reports notReady at 08:50.
The C.2.1 episteme FixtureTestEntryReadinessResult-E1, whose exact EntityOfConcern is WorkPlan-LAB-043, reports that readiness verdict and its grounds for PlanItem-TEST-043: the calibration result is expired and the fixture-drawing edition remains unresolved. Its stop is do not start planned-fixture-deformation-test-043; its return condition is obtain a current calibration result, select the drawing edition, and rerun the readiness check. The preparation and checking Work occurred; the target test did not. No A.21 gate decision or A.2.8.PER permission result follows from this readiness result.
What changes in practice. The team withholds the target test and prepares the current calibration and selected drawing. After those inputs are available, it reapplies the criterion and reuses other unchanged applicable grounds. Any assignment of that preparation has its own allocation basis; the readiness result itself supplies no duty or target Work.
A.15.5:5.2 - Documentation Repair Probe
Situation: an assisting agent can run a reversible documentation probe to find source-currentness gaps.
Use A.15.5 for the probe only if its work-entry decision needs a readiness criterion; an ordinary sufficient reversible probe needs no automatic formal plan or readiness result. When that branch is selected, apply the criterion to the probe’s WorkPlan and return the bounded value. If the account later claims the performed probe as a dated Work, recover its A.13 core and independent A.15.1 admission, adding F.6 only for precise attribution. A target-repair readiness question is then evaluated separately; the probe plan, readiness, actual occurrence and target-repair result establish different claims.
A.15.5:5.3 - Release screen with separate readiness, gate, and permission windows
At 10:00 UTC on 2026-07-27, the evaluator applies ReleaseEntryCriterion-E3 to ReleasePlan-E7 and PlanItem-Deploy-12. The result says ready for reliance only in [10:00, 10:30) and requires recheck when a consumed source, resource, assignment, permission or gate input changes. All times below use UTC on that date.
At 10:05, the current A.21 application of profile Release-Core-E4 consumes that readiness result through one identified GateCheckApplicationResult, cited by its GateCheckRef, among the complete effective check set. The gate returns a GateDecisionResult with decisionValue=pass for [10:05, 10:20); DecisionLogRef=ReleaseGateLog-12 cites the separate log recording that result. That gate result is not the readiness result and does not institute permission.
Separately, A.2.8.PER GrantedPermissionRelation@Context occurrence DeployGrant-12 covers the named beneficiary and deployment action for [09:00, 11:00). DeployNonProhibitionFinding-E2 reports nonProhibited from its named current frame, explicitly complete for this use, in evaluation window [10:00, 10:15); it is not the grant. A PermissionNormConflictFinding@Context, if an incompatible current norm is established over the same content and window, would be a third permission-side input and an unresolved disposition would stop the use. A policy that requires readiness, gate passage, a current grant, and the frame-relative non-prohibition result may rely on those distinct inputs at 10:10; it must re-evaluate the relevant branch when any window ends or a conflict appears. None of them proves that deployment Work occurred. A.15.1 identifies that Work only after its dated occurrence basis obtains.
If a dashboard shows green but the required readiness result or its reliance window, the current A.21 profile application and gate result, or the required permission value and qualification window cannot be recovered, resolve the missing basis under its subject pattern before relying on the affected claim. Recover the gate result directly or through ReleaseGateLog-12; loss of the log alone need not block reliance on a fully recoverable result. Open the A.10 evidence-provenance and currentness question when that basis for a consumed claim is unresolved.