A.15.5:4 - Solution

State readiness as a domain-local result about the identified plan content. When the result needs its own reference, identify its C.2.1 episteme; retain a durable representation when later access requires it.

Full-kit use. Use the plan, input facts and readiness result needed by the work-entry question. The source contribution and limits of the TameFlow adaptation are stated in §11.

A.15.5:4.1 - One work-entry readiness claim

For a verdict on a particular plan item, start with this sentence:

At evaluation time T, criterion C applied to intended performance I in PlanItem J of WorkPlan P yields readiness value R for use through window V; stop or recheck when Q occurs.

P is a WorkPlan episteme; J and I are its plan-local ClaimGraph content. A.15.3 applies when that content selects a member of an admitted declaration. C is the criterion episteme applicable to that item and evaluation time. R is one local ReadinessResultValue. If the account also identifies a dated checking occurrence W, admit it independently under §4.2’s A.13/A.15.1 rule and add F.6 only for a consumed assignment-bound claim. The readiness verdict remains separate from that Work, a gate decision, permission or commitment.

The local value family is:

  • ready — every input required by C is determined and satisfies C for V;
  • readyWithKnownGaps — C explicitly admits the named gaps for this bounded use, every non-waived input is determined and satisfied, and V plus the stop condition expose the remaining risk;
  • notReady — an applicable failure or closure condition in C is determined for this case; and
  • unknown — one required fact, currentness result, predicate, or applicability basis cannot be determined, and no already determined applicable failure or closure condition settles the result as notReady. Absence of an assertion or persisted episteme is not by itself notReady.

When the result needs a separate identity, its C.2.1 episteme has P as EntityOfConcern and a ClaimGraph stating J, I, C, R, the evaluated facts, evaluation time, reliance window and recheck condition under the effective reference scheme. Include W only when its occurrence is a claimed input. C.2.1 supplies identity. For reusable predicate semantics use A.6.RCD’s corresponding branch; open relation-kind admission only when a receiving use needs distinct readiness occurrences.

When reporting what a particular evaluation returned, identify its actual application and result binding or a direct evaluation-result predicate with its obtaining facts (A.15.1:4.6). Retain the ordinary result format when the receiving use asks for readiness itself.

The result episteme states the readiness judgement. If a current claim says that exact checking or preparation Work first constituted that episteme, recover that local entity-identity inception claim under A.15.PROD.

A.15.5:4.2 - Readiness criterion and full-kit inputs

Start from the decision about entry. If the question is whether the item passes a specified criterion, apply it and state the scope of that verdict. To design a criterion for the promised work, work back from the results due, their recipients and deadlines. Follow the contributions each result needs, when each input must be available and who can secure it. Include a handoff when the next contribution depends on what it receives. Check shared capacities and reservations across the combinations of demand the agreement permits, including successive claims on a stock before it can be replenished. A resource needed later can be secured by a dependable arrangement for obtaining it in time. Separate a choice the team can make at entry from one another party may make later. If a promise covers either choice, establish that the team can honour it with the information and authority it will then have.

For example, a workshop is to issue one replacement cartridge to each of two crews on the same day. It has one cartridge and can obtain another only the following morning. Each issue considered alone fits the stock. The first issue exhausts it before the second crew can be served. Under an agreement for just one issue to whichever crew claims it first, that same stock covers the quantity due. These terms determine which stock condition belongs in the criterion.

For a reusable criterion, specify the work it covers, the conditions that would permit or prevent entry and the time at which each condition must be met. Show how the rule treats the combinations of demands and later choices within the agreement. When applying it to a proposed start, state:

  • the exact WorkPlan and its present EntityOfConcern, PlanItem, intended-performance designator, any exact intended-work target and intended outcome or value claim current in the plan, any current intended-work kind or work-family classification, target U.Method, evaluation time, and applicability window it judges;
  • each required positive or negative predicate, the allowed named gaps if any, and the rule for ready, readyWithKnownGaps, notReady, and unknown;
  • which changed fact, expired interval, new conflict, source revision, or resource or assignment change ends reliance; and
  • the stop, degraded-use, preparation, or recheck action for each non-ready result.

Full-kit thinking helps recognize possible inputs. Check only the input claims that C consumes:

  1. exact A.15.2 plan content and any A.15.3 planned fillings, with the declaration member and conditions that give each filling meaning;
  2. current information, source-currentness, publication, measurement, evidence, or assurance claims under their subject patterns;
  3. resource-availability or reservation claims, intended performer Systems and local system-role-kind conditions, any already obtaining occurrence of an exact directly declared U.SystemRoleAssignment species when C requires an assignment, capability threshold or fit result, and commitment claims when C uses them; plus any current work-in-progress or load and flow-policy claims under the pattern that defines their counted work, boundary, threshold, and qualification window;
  4. preparation or checking results required by C, and separately admitted preparation/checking Work only when its occurrence is consumed by the criterion;
  5. the applicable prospective permission basis, including a standing rule and the facts satisfying it, or the particular A.2.8.PER grant or finding the criterion uses, within its effective scope and time; and
  6. an exact A.21 GateDecisionResult only when a current A.21 profile application governs the declared check applications and their mappings to that decision. The gate decision remains a separate result.

A post-launch variance or recheck result may enter only after the target Work is actual and only through the measurement, comparison, evaluation, resource, temporal, acceptance, or other pattern that defines that result. Name the target Work, comparison or evaluation rule, local result, qualification window, and subject pattern. It may trigger or inform an explicitly marked recheck; it neither proves that readiness held before entry nor rewrites the earlier readiness result. For each input, name the subject pattern, exact proposition or relation occurrence, and the interval or currentness result on which this readiness check relies. A generic input, evidence, context, resource, assignment, or policy reference supplies none of those facts. Omission says only that the current criterion did not consume that input; it does not prove absence.

Full-kit preparation can include gathering information, coordinating intended performer Systems and local system-role-kind conditions, producing a missing source U.Episteme or source publication, reserving a resource, pinning a planned filling, or creating shared understanding. When a dated occurrence is claimed as U.Work, actual performance and the admission basis below must be established. Plan the preparation beforehand; cite its actual result or admitted Work only after the corresponding facts are established.

For every cited preparation or readiness-checking Work occurrence, apply the complete A.15.1:4.0–4.1 admission test. Establish the common A.1:4.2 construction of that same candidate, each actual performer’s A.13 core, grounded performance history following at least one identified Method, temporal extent, and the factual conditions of a locally declared relation containing the complete occurrence within a System boundary. Admit the candidate, then state its typed Method-enactment and containing-System relations. Only when the readiness claim needs precise assignment-bound attribution, establish F.6 afterward through the same obtaining A.13 assignment and keep its declared species, participants, holder, coverage, and exact Work-assignment link recoverable. Name another enacted Method, boundary, direct participant relation, or A.6.1 binding when the readiness claim uses it. A planned preparation task remains A.15.2 content until the occurrence facts obtain.

Boundary with planned fillers and appearance-based reliance. An ordinary missing plan choice stays with A.15.2. Use A.15.3 when the proposed choice is declaration-local planned-filling content: recover the actual declaration member and its meaning and use conditions. A known evidence, currentness, publication, gate, permission or assurance claim goes directly to its subject pattern. Use A.15.4 while an appearance is being relied on before the required predicate and its basis have been recovered.

A.15.5:4.3 - Commitment and Launch Boundary

Keep commitment facts separate from the readiness value. The criterion may consume current commitment claims and their qualification intervals, but ready, readyWithKnownGaps, notReady, or unknown does not mean committed, institute a commitment, discharge one, or authorize entry. State the practical next move—stop, prepare, probe, seek a separately governed commitment, submit to a gate, launch only under its separately satisfied entry conditions, or recheck—as the result’s bounded use and return condition, not as another ontic status family.

The older labels readyForProbe, readyForCommitment, committed, blocked, and requiresGateDecision therefore resolve to a local readiness value plus an explicit next move, commitment claim, stop, or gate question; they are not additional ReadinessResultValue members.

When the readiness criterion depends on permission, establish how it arises under A.2.8.PER. A standing rule and the qualifying facts can directly permit entry. For a criterion that calls for one or more of the following values, identify each required value within its qualification: a current GrantedPermissionRelation@Context occurrence with its beneficiary, permitted-action specification, U.ClaimScope, and validityWindow; a distinct NonProhibitionFinding@Context with its frame and evaluationWindow; and any PermissionNormConflictFinding@Context with its overlapWindow and disposition. For a settled conflict, retain the applicable precedence rule and its qualification, or the current resolution result and effectiveWindow, according to A.2.8.PER:4.6. Non-prohibition is not a grant, and a grant does not itself settle a conflict. An unresolved conflict limits the readiness use under C; the affected action remains blocked under the permission rule. Cite PermissionExerciseRelation@Context or NonViolationFinding@Context only for already dated Work: either as evidence about a different Work occurrence or in an explicitly marked post-launch recheck after the target Work is actual, retaining its own exerciseInterval or evaluationWindow. Those retrospective findings support their named past claims; prospective grant, capability, readiness and entry claims need their own current grounds.

Use A.21 when a current profile application governs the declared check applications and their mappings to a distinct GateDecisionResult. Keep that result, scope, currentness and qualification window recoverable. Use DecisionLogRef when a log supplies the access, audit or replay path or the applicable policy requires it.

A.15.5:4.4 - Relation to A.15 Family

Current claimSubject pattern
Intended target work and horizonA.15.2 U.WorkPlan.
Planned fillings before workA.15.3 declaration-local planned-filling content inside the U.WorkPlan.
Preparation activity that actually happenedA.15.1 U.Work.
Target work that actually happenedA.15.1 U.Work.
Readiness before work entryA.15.5 local result claim; C.2.1 identifies a result episteme when that content needs its own reference.
Resource budgets or reservations before workA.15.2 plan content plus the exact predicate and source for the current resource-availability or reservation claim; A.15.5 cites the current claim only when the criterion consumes it.
Resource consumption by workB.1.6 plus A.15.1.

A.15.5:4.5 - Relation to P2W and Pattern Use

When E.18.1 carries accepted problem-side material to a readiness question, E.18.1 names that carry-through relation and cites A.15.5 for the readiness result. When a user needs to know which pattern to use before readiness is current, use E.11.PUR.