| Intended target work and horizon | A.15.2 U.WorkPlan. |
| Planned fillings before work | A.15.3 declaration-local planned-filling content inside the U.WorkPlan. |
| Preparation activity that actually happened | A.15.1 U.Work. |
| Target work that actually happened | A.15.1 U.Work. |
| Readiness before work entry | A.15.5 local result claim; C.2.1 identifies a result episteme when that content needs its own reference. |
| Resource budgets or reservations before work | A.15.2 plan content plus the exact predicate and source for the current resource-availability or reservation claim; A.15.5 cites the current claim only when the criterion consumes it. |
| Resource consumption by work | B.1.6 plus A.15.1. |