Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 23:00:10 UTC

A.15.5:4.2 - Readiness criterion and full-kit inputs

Start from the decision about entry. If the question is whether the item passes a specified criterion, apply it and state the scope of that verdict. To design a criterion for the promised work, work back from the results due, their recipients and deadlines. Follow the contributions each result needs, when each input must be available and who can secure it. Include a handoff when the next contribution depends on what it receives. Check shared capacities and reservations across the combinations of demand the agreement permits, including successive claims on a stock before it can be replenished. A resource needed later can be secured by a dependable arrangement for obtaining it in time. Separate a choice the team can make at entry from one another party may make later. If a promise covers either choice, establish that the team can honour it with the information and authority it will then have.

For example, a workshop is to issue one replacement cartridge to each of two crews on the same day. It has one cartridge and can obtain another only the following morning. Each issue considered alone fits the stock. The first issue exhausts it before the second crew can be served. Under an agreement for just one issue to whichever crew claims it first, that same stock covers the quantity due. These terms determine which stock condition belongs in the criterion.

For a reusable criterion, specify the work it covers, the conditions that would permit or prevent entry and the time at which each condition must be met. Show how the rule treats the combinations of demands and later choices within the agreement. When applying it to a proposed start, state:

  • the exact WorkPlan and its present EntityOfConcern, PlanItem, intended-performance designator, any exact intended-work target and intended outcome or value claim current in the plan, any current intended-work kind or work-family classification, target U.Method, evaluation time, and applicability window it judges;
  • each required positive or negative predicate, the allowed named gaps if any, and the rule for ready, readyWithKnownGaps, notReady, and unknown;
  • which changed fact, expired interval, new conflict, source revision, or resource or assignment change ends reliance; and
  • the stop, degraded-use, preparation, or recheck action for each non-ready result.

Full-kit thinking helps recognize possible inputs. Check only the input claims that C consumes:

  1. exact A.15.2 plan content and any A.15.3 planned fillings, with the declaration member and conditions that give each filling meaning;
  2. current information, source-currentness, publication, measurement, evidence, or assurance claims under their subject patterns;
  3. resource-availability or reservation claims, intended performer Systems and local system-role-kind conditions, any already obtaining occurrence of an exact directly declared U.SystemRoleAssignment species when C requires an assignment, capability threshold or fit result, and commitment claims when C uses them; plus any current work-in-progress or load and flow-policy claims under the pattern that defines their counted work, boundary, threshold, and qualification window;
  4. preparation or checking results required by C, and separately admitted preparation/checking Work only when its occurrence is consumed by the criterion;
  5. the applicable prospective permission basis, including a standing rule and the facts satisfying it, or the particular A.2.8.PER grant or finding the criterion uses, within its effective scope and time; and
  6. an exact A.21 GateDecisionResult only when a current A.21 profile application governs the declared check applications and their mappings to that decision. The gate decision remains a separate result.

A post-launch variance or recheck result may enter only after the target Work is actual and only through the measurement, comparison, evaluation, resource, temporal, acceptance, or other pattern that defines that result. Name the target Work, comparison or evaluation rule, local result, qualification window, and subject pattern. It may trigger or inform an explicitly marked recheck; it neither proves that readiness held before entry nor rewrites the earlier readiness result. For each input, name the subject pattern, exact proposition or relation occurrence, and the interval or currentness result on which this readiness check relies. A generic input, evidence, context, resource, assignment, or policy reference supplies none of those facts. Omission says only that the current criterion did not consume that input; it does not prove absence.

Full-kit preparation can include gathering information, coordinating intended performer Systems and local system-role-kind conditions, producing a missing source U.Episteme or source publication, reserving a resource, pinning a planned filling, or creating shared understanding. When a dated occurrence is claimed as U.Work, actual performance and the admission basis below must be established. Plan the preparation beforehand; cite its actual result or admitted Work only after the corresponding facts are established.

For every cited preparation or readiness-checking Work occurrence, apply the complete A.15.1:4.0–4.1 admission test. Establish the common A.1:4.2 construction of that same candidate, each actual performer’s A.13 core, grounded performance history following at least one identified Method, temporal extent, and the factual conditions of a locally declared relation containing the complete occurrence within a System boundary. Admit the candidate, then state its typed Method-enactment and containing-System relations. Only when the readiness claim needs precise assignment-bound attribution, establish F.6 afterward through the same obtaining A.13 assignment and keep its declared species, participants, holder, coverage, and exact Work-assignment link recoverable. Name another enacted Method, boundary, direct participant relation, or A.6.1 binding when the readiness claim uses it. A planned preparation task remains A.15.2 content until the occurrence facts obtain.

Boundary with planned fillers and appearance-based reliance. An ordinary missing plan choice stays with A.15.2. Use A.15.3 when the proposed choice is declaration-local planned-filling content: recover the actual declaration member and its meaning and use conditions. A known evidence, currentness, publication, gate, permission or assurance claim goes directly to its subject pattern. Use A.15.4 while an appearance is being relied on before the required predicate and its basis have been recovered.