A.15.2:6 - Archetypal grounding (parallel domains)

These constructed cases stipulate their project facts. The hospital case follows one plan item through a later comparison; the other cases show different constraints and reuse limits.

A.15.2:6.1 - Hospital OR day plan (shift rota + cases)

  • WorkPlan: OR_DayPlan_2025-08-12-E3 : U.WorkPlan is one C.2.1 episteme. Its present EntityOfConcern is existing system OR-Service-System-12 : U.System; its effective reference scheme is HospitalORPlanningScheme-E4; its horizon is 2025-08-12T00:00:00+03:00/2025-08-13T00:00:00+03:00. Proposed case performances remain ClaimGraph designators and are not dated Work occurrences.
  • One PlanItem: Case_1_Appendectomy coordinates proposed performance PlannedAppendectomy-Case1 through the following content.
PlanItem concernFilled value
target methodLaparoscopicAppendectomyMethod-E2 : U.Method
planned window2025-08-12T09:00:00+03:00/2025-08-12T10:30:00+03:00
intended performer and system-role-kind conditionsone performer System satisfying SurgeonSystemRole and AppendectomyLeadCapability-v3; one performer System satisfying AnesthetistSystemRole and ORAnesthesiaCapability-v2; these are intended conditions, not system-role assignments
budget and reservations90 minutes of OR-3, one SterileKit-A17, and consumables budget ORCase1-Consumables-B3
dependencypositive PreOpClearance-Case1-E2 claim must be current before the planned window starts
acceptance targetprocedureCompleteBy10:30, compared under C.27.TA against the exact Work extent after Work occurs
baselineC.2.1 episteme OR-DayBaseline-2025-08-05-E1
  • Later Work: The case independently admits DrK and DrM as Systems. Under the local A.13 criteria, DrK regulates the operative action to the procedure target and DrM maintains the declared anesthesia conditions under relevant perturbations; the stipulated observations support these classifications for the surgery scope and window. Under the directly declared assignment species, the stipulated case facts establish obtaining RA-Surgeon-DrK-2025-08-12 and RA-Anesthetist-DrM-2025-08-12 occurrences with those Systems as holders and the intended local kinds, covering that window. The observed performance history and the local containing-System predicate place the complete occurrence within OR-Service-System-12. For this constructed case, also assume that all six common construction components under A.1:4.2 have been independently established for AppendectomyWork-2025-08-12-Case1.

    These premises and the enactment and extent below independently admit AppendectomyWork-2025-08-12-Case1 : U.Work under A.15.1, with workContinuityPolicyRef = SingleProcedureFromAnesthesiaStartToHandover-E1, temporal extent 2025-08-12T09:04:00+03:00/2025-08-12T10:21:00+03:00, and enactsMethod to LaparoscopicAppendectomyMethod-E2.

    Because the named one-case policy expressly consumes both assignment-bound attributions, F.6 afterward establishes performedUnderAssignment for RA-Surgeon-DrK-2025-08-12 and RA-Anesthetist-DrM-2025-08-12 through those same assignments. The named policy tests the within-window claim qualified under C.27.TA. Either failed F.6 relation alone would prevent this attribution-dependent fulfilment conclusion while preserving independent Work admission. If the same finding questions an actual admission premise, recheck that premise and its dependents under A.15.1.

  • Named one-case policy: ORCase1FulfilmentPolicy-E2 is one C.2.1 episteme about plan episteme OR_DayPlan_2025-08-12-E3, interpreted under HospitalORPlanningScheme-E4. Its ClaimGraph is limited to item Case_1_Appendectomy and states positive polarity only when the identified Work enacts the target Method, both required performedUnderAssignment relations obtain, and its extent lies inside the planned window. It uses only those four facts for this local conclusion, does not travel to another plan episteme, and admits no fulfilment relation kind.

  • Visible result: C.2.1 assertion episteme OR-DayPlan-Case1-Fulfilment-Assertion-E1 has OR_DayPlan_2025-08-12-E3 as its EntityOfConcern; its ClaimGraph names AppendectomyWork-2025-08-12-Case1, item Case_1_Appendectomy, policy ORCase1FulfilmentPolicy-E2, the four supporting facts, and positive polarity. The result says that this Work satisfies this plan item under that policy. It does not rewrite the plan and does not assert a universal relation.

  • Nearest false shortcut: a theatre log row carrying key Case_1_Appendectomy and start time 09:04 establishes neither performedUnderAssignment nor enactsMethod. Without those independently obtaining facts the local conclusion returns missing-information; matching labels and times produce neither negative polarity nor fulfilment.

  • Edition boundary: this is the first plan episteme selected for the day. Changing its ClaimGraph identifies another episteme; edition continuity with the earlier plan requires its own C.2.1 basis. If that relation is unestablished, continuity remains unresolved rather than becoming negative. A reused label or Rev-4 note supplies no such basis. A later fulfilment policy must identify whichever plan it judges.

A.15.2:6.2 - Fab maintenance weekend (asset reservations)

  • WorkPlan: Fab_Maintenance_W36 is interpreted under FabMaintenancePlanningScheme-E3, has horizon [2025-09-06T00:00Z, 2025-09-08T00:00Z), and concerns already identified Fab-Production-System-4 : U.System. Tool_42 and Tool_13 remain assets named by the PlanItems; they are not an unproved joint EntityOfConcern.
  • PlanItem content: Tool_42 chamber clean under ChamberCleanMethod-E2; Tool_13 calibration under ToolCalibrationMethod-E1; the ClaimGraph carries an exclusivity constraint with production windows. The scheduling policy, per-item windows and reserved quantities remain case inputs for this abbreviated illustration.
  • Reservations and decision: nitrogen, DI water and a metrology window. Suppose each task takes one uninterrupted hour with the sole metrology technician, either order is allowed and both tasks must finish in the same maintenance window. When the technician and both tools are free for three hours clear of production, with all other inputs ready, reserve consecutive hours for the two tasks. If the only available hour is the same for both, the separate reservations cannot be honoured together. Changing the window or providing another qualified technician is a new planning choice.
  • Later local assertion: The chamber-cleaning Work occurrence is identified independently as an individual admitted under U.Work. FabChamberCleanPlanUsePolicy-E1 asks whether that Work enacted ChamberCleanMethod-E2, stayed inside the planned window, and kept nitrogen use within the reserved amount. A.15.1 supplies the Work and enactment facts; C.27.TA qualifies the within-window claim; B.1.6 supplies the resource aggregate used in the budget comparison. For this illustration, assume that the three policy conditions all obtain; a separate C.2.1 assertion about the plan then states positive fulfilment. Early completion and nitrogen underrun additionally require the corresponding strict comparisons. A shared item label or reservation row supplies none of those facts.

A.15.2:6.3 - Data-center rollout (multi-context plan)

  • WorkPlan: DC_Rollout_Phase-2 is interpreted under DCOperationsPlanningScheme-E5, has horizon [2025-09-01T00:00Z, 2025-09-15T00:00Z), and concerns already identified Service-A-Operations-System : U.System. The Security Audit scheme remains a separate interpretation source used only through the branch below.
  • Interpretation boundary: Operations uses DCOperationsPlanningScheme-E5; Security Audit uses SecurityAuditScheme-E4. Their acceptance criteria remain separate; apply the branch in checklist item 7 before proposing any cross-context reuse.
  • Bridge premise: F.17 cells OperationsReadyCell-E3 and SecurityAuditPassedCell-E2 participate in F.9 Bridge OpsAuditReadinessOverlapBridge-E1 under OpsAuditPartialOverlapProfile-E1. The Bridge obtains as partial-overlap: both senses exclude a known blocking security defect, while Operations readiness also requires rollback rehearsal and live monitoring and the audit sense applies its own security criteria.
  • Rejected verdict transfer: C.2.1 claim AuditPassAsOperationsReadyUse-E1 proposes copying GateDecision=pass from A.21 gate SecurityAuditGate-E2 into an A.15.5 work-entry readiness result, from the audit cell to the Operations cell, by identity transfer and with zero tolerance for omitted readiness conditions. The claim is negative because the two senses do not align on rollback rehearsal or monitoring readiness. A.10 evidence-provenance path OpsAuditTransferEvidencePath-E1 has RelianceDisposition=pass for that negative claim, so the team retains the A.21 audit decision and evaluates Operations readiness separately under A.15.5. The obtaining Bridge remains true. A narrower plan use may cite the audit decision as one readiness input; it still cannot transfer the verdict.
  • PlanItem content: Deploy Service A, Pen-test A; dependency and window claims name their predicates and conditions inside the plan ClaimGraph.
  • Later local assertions: Deployment and audit Work occurrences are identified independently as individuals admitted under U.Work. Separate operations and audit evaluations apply their own targets and produce separately governed verdicts; plan-use assertions state local fulfilment and per-context comparison without adding those actual facts to the plan content or creating one cross-context fulfilment relation.