A.15.2:6 - Archetypal grounding (parallel domains)
These constructed cases stipulate their project facts. The hospital case follows one plan item through a later comparison; the other cases show different constraints and reuse limits.
A.15.2:6.1 - Hospital OR day plan (shift rota + cases)
- WorkPlan:
OR_DayPlan_2025-08-12-E3 : U.WorkPlanis one C.2.1 episteme. Its presentEntityOfConcernis existing systemOR-Service-System-12 : U.System; its effective reference scheme isHospitalORPlanningScheme-E4; its horizon is2025-08-12T00:00:00+03:00/2025-08-13T00:00:00+03:00. Proposed case performances remain ClaimGraph designators and are not dated Work occurrences. - One
PlanItem:Case_1_Appendectomycoordinates proposed performancePlannedAppendectomy-Case1through the following content.
| PlanItem concern | Filled value |
|---|---|
| target method | LaparoscopicAppendectomyMethod-E2 : U.Method |
| planned window | 2025-08-12T09:00:00+03:00/2025-08-12T10:30:00+03:00 |
| intended performer and system-role-kind conditions | one performer System satisfying SurgeonSystemRole and AppendectomyLeadCapability-v3; one performer System satisfying AnesthetistSystemRole and ORAnesthesiaCapability-v2; these are intended conditions, not system-role assignments |
| budget and reservations | 90 minutes of OR-3, one SterileKit-A17, and consumables budget ORCase1-Consumables-B3 |
| dependency | positive PreOpClearance-Case1-E2 claim must be current before the planned window starts |
| acceptance target | procedureCompleteBy10:30, compared under C.27.TA against the exact Work extent after Work occurs |
| baseline | C.2.1 episteme OR-DayBaseline-2025-08-05-E1 |
-
Later Work: The case independently admits DrK and DrM as Systems. Under the local A.13 criteria, DrK regulates the operative action to the procedure target and DrM maintains the declared anesthesia conditions under relevant perturbations; the stipulated observations support these classifications for the surgery scope and window. Under the directly declared assignment species, the stipulated case facts establish obtaining
RA-Surgeon-DrK-2025-08-12andRA-Anesthetist-DrM-2025-08-12occurrences with those Systems as holders and the intended local kinds, covering that window. The observed performance history and the local containing-System predicate place the complete occurrence withinOR-Service-System-12. For this constructed case, also assume that all six common construction components under A.1:4.2 have been independently established forAppendectomyWork-2025-08-12-Case1.These premises and the enactment and extent below independently admit
AppendectomyWork-2025-08-12-Case1 : U.Workunder A.15.1, withworkContinuityPolicyRef = SingleProcedureFromAnesthesiaStartToHandover-E1, temporal extent2025-08-12T09:04:00+03:00/2025-08-12T10:21:00+03:00, andenactsMethodtoLaparoscopicAppendectomyMethod-E2.Because the named one-case policy expressly consumes both assignment-bound attributions, F.6 afterward establishes
performedUnderAssignmentforRA-Surgeon-DrK-2025-08-12andRA-Anesthetist-DrM-2025-08-12through those same assignments. The named policy tests the within-window claim qualified under C.27.TA. Either failed F.6 relation alone would prevent this attribution-dependent fulfilment conclusion while preserving independent Work admission. If the same finding questions an actual admission premise, recheck that premise and its dependents under A.15.1. -
Named one-case policy:
ORCase1FulfilmentPolicy-E2is one C.2.1 episteme about plan epistemeOR_DayPlan_2025-08-12-E3, interpreted underHospitalORPlanningScheme-E4. Its ClaimGraph is limited to itemCase_1_Appendectomyand states positive polarity only when the identified Work enacts the target Method, both requiredperformedUnderAssignmentrelations obtain, and its extent lies inside the planned window. It uses only those four facts for this local conclusion, does not travel to another plan episteme, and admits no fulfilment relation kind. -
Visible result: C.2.1 assertion episteme
OR-DayPlan-Case1-Fulfilment-Assertion-E1hasOR_DayPlan_2025-08-12-E3as itsEntityOfConcern; its ClaimGraph namesAppendectomyWork-2025-08-12-Case1, itemCase_1_Appendectomy, policyORCase1FulfilmentPolicy-E2, the four supporting facts, and positive polarity. The result says that this Work satisfies this plan item under that policy. It does not rewrite the plan and does not assert a universal relation. -
Nearest false shortcut: a theatre log row carrying key
Case_1_Appendectomyand start time09:04establishes neitherperformedUnderAssignmentnorenactsMethod. Without those independently obtaining facts the local conclusion returnsmissing-information; matching labels and times produce neither negative polarity nor fulfilment. -
Edition boundary: this is the first plan episteme selected for the day. Changing its ClaimGraph identifies another episteme; edition continuity with the earlier plan requires its own C.2.1 basis. If that relation is unestablished, continuity remains unresolved rather than becoming negative. A reused label or
Rev-4note supplies no such basis. A later fulfilment policy must identify whichever plan it judges.
A.15.2:6.2 - Fab maintenance weekend (asset reservations)
- WorkPlan:
Fab_Maintenance_W36is interpreted underFabMaintenancePlanningScheme-E3, has horizon[2025-09-06T00:00Z, 2025-09-08T00:00Z), and concerns already identifiedFab-Production-System-4 : U.System.Tool_42andTool_13remain assets named by the PlanItems; they are not an unproved joint EntityOfConcern. PlanItemcontent:Tool_42 chamber cleanunderChamberCleanMethod-E2;Tool_13 calibrationunderToolCalibrationMethod-E1; the ClaimGraph carries an exclusivity constraint with production windows. The scheduling policy, per-item windows and reserved quantities remain case inputs for this abbreviated illustration.- Reservations and decision: nitrogen, DI water and a metrology window. Suppose each task takes one uninterrupted hour with the sole metrology technician, either order is allowed and both tasks must finish in the same maintenance window. When the technician and both tools are free for three hours clear of production, with all other inputs ready, reserve consecutive hours for the two tasks. If the only available hour is the same for both, the separate reservations cannot be honoured together. Changing the window or providing another qualified technician is a new planning choice.
- Later local assertion: The chamber-cleaning Work occurrence is identified independently as an individual admitted under
U.Work.FabChamberCleanPlanUsePolicy-E1asks whether that Work enactedChamberCleanMethod-E2, stayed inside the planned window, and kept nitrogen use within the reserved amount. A.15.1 supplies the Work and enactment facts; C.27.TA qualifies the within-window claim; B.1.6 supplies the resource aggregate used in the budget comparison. For this illustration, assume that the three policy conditions all obtain; a separate C.2.1 assertion about the plan then states positive fulfilment. Early completion and nitrogen underrun additionally require the corresponding strict comparisons. A shared item label or reservation row supplies none of those facts.
A.15.2:6.3 - Data-center rollout (multi-context plan)
- WorkPlan:
DC_Rollout_Phase-2is interpreted underDCOperationsPlanningScheme-E5, has horizon[2025-09-01T00:00Z, 2025-09-15T00:00Z), and concerns already identifiedService-A-Operations-System : U.System. The Security Audit scheme remains a separate interpretation source used only through the branch below. - Interpretation boundary: Operations uses
DCOperationsPlanningScheme-E5; Security Audit usesSecurityAuditScheme-E4. Their acceptance criteria remain separate; apply the branch in checklist item 7 before proposing any cross-context reuse. - Bridge premise: F.17 cells
OperationsReadyCell-E3andSecurityAuditPassedCell-E2participate in F.9 BridgeOpsAuditReadinessOverlapBridge-E1underOpsAuditPartialOverlapProfile-E1. The Bridge obtains aspartial-overlap: both senses exclude a known blocking security defect, while Operations readiness also requires rollback rehearsal and live monitoring and the audit sense applies its own security criteria. - Rejected verdict transfer: C.2.1 claim
AuditPassAsOperationsReadyUse-E1proposes copyingGateDecision=passfrom A.21 gateSecurityAuditGate-E2into an A.15.5 work-entry readiness result, from the audit cell to the Operations cell, by identity transfer and with zero tolerance for omitted readiness conditions. The claim is negative because the two senses do not align on rollback rehearsal or monitoring readiness. A.10 evidence-provenance pathOpsAuditTransferEvidencePath-E1hasRelianceDisposition=passfor that negative claim, so the team retains the A.21 audit decision and evaluates Operations readiness separately under A.15.5. The obtaining Bridge remains true. A narrower plan use may cite the audit decision as one readiness input; it still cannot transfer the verdict. PlanItemcontent:Deploy Service A,Pen-test A; dependency and window claims name their predicates and conditions inside the plan ClaimGraph.- Later local assertions: Deployment and audit Work occurrences are identified independently as individuals admitted under
U.Work. Separate operations and audit evaluations apply their own targets and produce separately governed verdicts; plan-use assertions state local fulfilment and per-context comparison without adding those actual facts to the plan content or creating one cross-context fulfilment relation.