A.15.2:5 - What a good WorkPlan states (review checklist)

Apply the items needed by the coordination or comparison claim; this is a recognition palette, not a required full schema:

  1. Present EntityOfConcern, horizon, and cadence (for example, the current service system and “W36 surgeries” or “daily ETL”), with possible future performances kept as plan-content designators.
  2. PlanItem content components with intended-performance designator, target Method, the selected method-description episteme when one plan claim relies on it, planned windows, and dependencies.
  3. Intended performer System and local system-role-kind conditions, any reference to an existing assignment occurrence and its declared species, and the A.2.2 capability threshold or fit condition; a proposed holder-and-kind pair or threshold is not an assignment or fit result.
  4. Safety envelopes, constraints, and other admissibility conditions for planned work.
  5. Resource budgets and reservation claims on assets.
  6. Acceptance targets with their direct criteria and intended qualification windows.
  7. Cross-context interpretation boundary: when a proposed use depends on correspondence between local senses with different interpretation bases, pin both effective reference schemes and resolve the two F.17 SchemeSenseCell values. F.9 says only whether their Bridge obtains. A separate C.2.1 claim says whether this reuse is acceptable in this direction, under this correspondence rule and tolerated loss; A.10 governs ordinary evidence reliance and B.3 governs assurance-bearing reliance. A negative use claim leaves the Bridge true but stops the reuse; a non-passing reliance result stops or narrows it. Establish any value conversion, target comparison, commitment, acceptance, verdict reuse, plan coordination, or Work claim separately under the pattern that defines it.
  8. Baseline when the receiving comparison needs one. Keep the earlier plan identifiable. Claim edition continuity only when EpistemeEditionRelation obtains, and use a change note when the attributed difference needs explanation. If continuity is unestablished, leave it unresolved; a first plan has no earlier plan relation, and a negative continuity claim needs its own basis.
  9. Policy pointers to A.15.1 work continuity, B.1.4 temporal aggregation, B.1.6 resource aggregation, and any local comparison policy needed by the receiving KPI.
  10. Exception question stating how ad hoc or emergency Work will be handled by a local plan-use assertion; use one reusable predicate-definition episteme when the receiving use needs a stable definition, and require an admitted direct relation kind before claiming fulfilment or exception occurrences.