A.15.2:5 - What a good WorkPlan states (review checklist)
Apply the items needed by the coordination or comparison claim; this is a recognition palette, not a required full schema:
- Present EntityOfConcern, horizon, and cadence (for example, the current service system and “W36 surgeries” or “daily ETL”), with possible future performances kept as plan-content designators.
PlanItemcontent components with intended-performance designator, target Method, the selected method-description episteme when one plan claim relies on it, planned windows, and dependencies.- Intended performer System and local system-role-kind conditions, any reference to an existing assignment occurrence and its declared species, and the A.2.2 capability threshold or fit condition; a proposed holder-and-kind pair or threshold is not an assignment or fit result.
- Safety envelopes, constraints, and other admissibility conditions for planned work.
- Resource budgets and reservation claims on assets.
- Acceptance targets with their direct criteria and intended qualification windows.
- Cross-context interpretation boundary: when a proposed use depends on correspondence between local senses with different interpretation bases, pin both effective reference schemes and resolve the two F.17
SchemeSenseCellvalues. F.9 says only whether their Bridge obtains. A separate C.2.1 claim says whether this reuse is acceptable in this direction, under this correspondence rule and tolerated loss; A.10 governs ordinary evidence reliance and B.3 governs assurance-bearing reliance. A negative use claim leaves the Bridge true but stops the reuse; a non-passing reliance result stops or narrows it. Establish any value conversion, target comparison, commitment, acceptance, verdict reuse, plan coordination, or Work claim separately under the pattern that defines it. - Baseline when the receiving comparison needs one. Keep the earlier plan identifiable. Claim edition continuity only when
EpistemeEditionRelationobtains, and use a change note when the attributed difference needs explanation. If continuity is unestablished, leave it unresolved; a first plan has no earlier plan relation, and a negative continuity claim needs its own basis. - Policy pointers to A.15.1 work continuity, B.1.4 temporal aggregation, B.1.6 resource aggregation, and any local comparison policy needed by the receiving KPI.
- Exception question stating how ad hoc or emergency Work will be handled by a local plan-use assertion; use one reusable predicate-definition episteme when the receiving use needs a stable definition, and require an admitted direct relation kind before claiming fulfilment or exception occurrences.