SYSE.9:7 - Conformance Checklist
Check the conditions on which the claimed result depends. If the decision uses an existing specialist result, establish its applicability. Check the conditions for a new request or newly performed Work when that is the claim.
- The receiving decision, deciding Agent, relying Work, and consequence are named.
- An adequate existing result can finish the question it answers. A discretionary acquisition has an obtainable contribution worth its whole burden. A specific commissioned performance is identified and completed, or the authorized party changes the commission.
- Subject, configuration, environment, interval, assumptions, and non-use boundary prevent application to the wrong case.
- A selected acquisition retains the supplier’s Method, inputs, expected evidence, and acceptance conditions, or names the missing basis without automatically assigning an inquiry.
- Planned reliance on a performer has a supported capability envelope, access and resources. Evidence of a completed performance identifies the occurrence at the reach of the claim. Attribution to a named performer requires grounds for who did it. Assignment, permission, authority and commitment each have their own grounds.
- Dated Work, enacted Method, performer, production relation, and returned result are recoverable when the decision consequence requires them.
- The receiver accepts within a reliance limit, rejects, requests repair, selects another contribution, or identifies the blocker and affected decision.
- A missing result remains distinct from a recurring capacity or decision-right problem. The latter reaches the responsible work- or organization-design practice with the affected decisions and constraint to change.
- Reopen conditions name the later change that can invalidate the result instead of requiring a generic periodic review.