SYSE.9:10 - Rationale
Whole-System decisions depend on results from unlike professional practices. The FPF distinctions between local system-role kinds, assignment, capability, Method, Work, production, evidence, deontic relations, and decisions help engineers establish how each result was obtained and how it may be used.
Engineers begin with the integrating decision, use available support, select worthwhile further acquisition, preserve each specialist Method and authority boundary, and make the useful answer or blocker available. Using the results together does not merge the contributing practices into one discipline.
Professional culture and project Work remain different structures. A discipline may vary, select, and retain new Methods over years. A project may select one of those Methods for intended use before it is enacted. Claim actual project use when evidence identifies the Method enacted in dated project Work. Establish the performer’s capability, enabling arrangements and any authorization separately when the receiving decision relies on them. Accepted results and subsequent evidence can support continued use.