SYSE.7:5 - Worked Case: Controller Architecture Description Ensemble
The project is preparing evidence for a controller-architecture decision: whether plant configuration HP-2
should use direct compressor modulation alone or modulation coordinated with thermal storage over the next three
heating seasons. The plant, use, configuration, and decision focus are the same across the selected inputs.
Outside-use, functional, and bearer descriptions already exist, but the decision-changing claims remain
distributed across several descriptions. The engineering team constructs this bounded account:
| Entry | Subject and use | Material interpretation or relation |
|---|---|---|
| use and operating-scenario episteme | The intended heat-pump plant in occupied-building use; supplies temperature, noise, maintenance, power-price, and grid-response situations. | Scenarios are possible use descriptions, not performed operation or test evidence. |
| functional-organization episteme | Candidate control organization: demand estimation, compressor modulation, storage dispatch, limit protection, and fault handling. | Treat the listed elements as functions until separate bearer and realization relations assign them to controller modules or software processes. |
| bearer-and-interface account | Candidate controller hardware, plant sensors, actuator connections, storage valve, communication interfaces, and allocations. | Names candidate Systems, physical interface specifications, and many-to-many function allocations for the decision. |
| equation-based plant model | Thermal plant and storage behavior under selected boundary conditions. | Modelica equations describe one selected physical abstraction; solver output is not observed plant behavior. |
| controller state and timing description | Control states, transitions, sampling assumptions, fallback conditions, and actuator commands. | The description concerns intended controller behavior and must correspond to the hardware timing and sensor claims. |
| component and wiring records | Sensor variants, controller I/O, update rates, error bounds, cable and connector configurations. | Catalogue claims apply only to component variants and conditions. |
| bench and commissioning results | Observations from controller-in-the-loop Work and later installed-plant trials. | Engineers use SYSE.10 to qualify which engineering claims those results support and SYSE.13 to keep tested configurations explicit. |
A collision check finds that the plant simulation and controller description assume a two-hertz supply-water
temperature update with an error bound of plus or minus 0.1 kelvin. The currently selected procurement variant
is specified only for a half-hertz update and plus or minus 0.3 kelvin under the installed cable length and
filtering arrangement. Matching the token SupplyTemperatureSensor across three tools had hidden the
difference.
The engineers identify the procured sensor and its installed signal path, update the model assumptions and run a controller-in-the-loop trial. Direct modulation remains acceptable for the tested building profile. The storage calculation still needs both a two-hertz update and an error within ±0.1 K. A faster update with the old ±0.3 K bound leaves that calculation unsupported. Evaluate the complete sensing or estimation path, including cable and filtering effects, against both assumptions. Alternatively, repeat the analysis with justified bounds for the available path. Use the resulting assurance evidence for the storage decision. Admission of a later storage increment still needs its own configuration and decision.
The account records the usable description editions, the unresolved estimator claim, the tested configuration, and a reconsideration condition tied to component substitution or a changed grid-response requirement. Controller, procurement, integration, configuration, and assurance Work use different publication forms over recoverable source epistemes while the decision-changing relations remain explicit.
If the data-management review already distinguishes the sensor variants and relates the model assumptions to the selected variant, the engineers reuse that result. When procurement later substitutes a variant, they reconsider the affected timing and error claims and the dependent architecture branch. Unchanged descriptions and qualified earlier results keep their stated applicability.
An AI System also produces a proposed cross-description summary and candidate correspondence list. Those outputs are new epistemes produced by performed Work. They are checked against source editions and accepted only where the relation and participants are recoverable. The generated confidence score supplies neither an evidence relation nor authority to alter the architecture decision.