SYSE.5:5 - Worked Case: Heat-Pump Plant Control and Protection

An occupied building has a heat-pump plant whose controller must respond to electricity-price and grid-flexibility signals while maintaining room comfort and protecting compressors. The engineering team must choose a control architecture for plant configuration HP-2 for the next three heating seasons. Earlier concept work identified two viable use/System concepts. A supervisor could use shared plant and tariff information to coordinate unit set-points. Any proposal using that connection must retain the required local protection during communication loss. The team still needs a comparison to establish whether central coordination improves the building result under the specified conditions.

During allocation Work, the engineers restore four contribution families as claims whose bearer arrangements remain to be chosen:

  • modulate heat production against building demand under temperature, occupancy, tariff, and plant conditions;
  • keep compressor pressure, temperature, cycling, and flow within protected limits;
  • accept, validate, and act on external price or flexibility signals within declared timing and authority;
  • retain local safe operation and recover state after communication, sensor, or controller failure.

They develop three materially different proposals:

  1. A central building controller carries demand estimation, optimization, dispatch, and most protection logic; unit controllers provide actuation and a small emergency stop.
  2. Local unit controllers carry protection and normal regulation; a supervisor sends bounded set-points and coordinates units, while loss of the supervisor leaves a declared local operating envelope.
  3. Thermal storage and a tariff scheduler carry most time-shifting; local controllers retain protection and regulation, so grid response is split across storage, scheduler, drives, sensors, and plant state estimation.

To construct proposal 2, the team works back from room comfort. In this case the rooms receive heat through water-fed emitters. Maintaining the selected room condition therefore requires heat delivery that can meet the building’s changing loss, a circulating water path, and suitable water conditions at the emitters. The heat pump must transfer energy from its source, with electrical input, to that water circuit. This identifies a cooperating thermal path before deciding which controller should carry each decision.

The team then connects regulation to that path. Room and water observations support an estimate of demand; unit-state observations delimit the operating capability. A valid price or flexibility request can change the supervisor’s requested operating point within those limits. The local controller accepts a compatible request and regulates the unit using local observations. Local protection can restrict or stop actuation when a protected condition would be violated. Heat delivery requires the thermal source, electrical supply, circulation, emitters, and admissible actuation to work together; issuing a set-point alone cannot produce the outside effect.

In normal operation, a change in room demand can alter the requested and locally accepted operating point, which changes heat transfer and subsequent room observations. Price information influences that choice but does not replace the heat demand or the protection condition. During communication loss, the proposed local mode continues regulation only from information and authority available locally; an unavailable remote request cannot remain a required input. If local conditions permit protection but insufficient heat delivery, the result is protected operation with reduced comfort, not satisfaction of the whole original requirement. Make that loss of comfort visible in the architecture decision.

Now change the relation between heat production and room delivery. Proposal 3 inserts thermal storage: the plant can charge it when permitted, while the distribution circuit can draw stored energy later. The scheduler consequently needs an estimate of usable stored energy and the permitted charge and discharge conditions, as well as demand and external signals. Local protection and the heat-delivery path remain necessary. What changes is the timing dependency: current delivery can depend on an earlier charge rather than simultaneous compressor operation. Storage, sensors, valves, and circulation must realize that changed relation.

For this candidate the team assumes a storage capacity and discharge rate adequate for a stated flexibility interval. It still needs a thermal/hydraulic account that covers losses, usable temperature range and room demand, together with storage-cycling evidence. If those conditions fail, the intended time-shift is unsupported: shorten the interval, change the storage or operating proposal, or retain proposal 2. The functional requirement and the local-protection contribution survive that return. Control behavior and physical margins require their specialist analyses and trials before reliance. This is a worked candidate construction, not a qualified plant design.

The functional contribution claims and candidate bearers are not one-to-one. Protection is distributed across software, local electronics, sensors, drive limits, valves, and physical pressure relief. Grid response depends on the supervisor or scheduler, communication bearer, storage state, unit capability, and operating permission. Every bearer entry identifies an actual System or intended referent and its proposed allocation. A model-box label such as protection or optimization is only a cue for recovering those claims.

The interface account separates signal semantics, units, timestamps, command validity, latency, state quality, fallback behavior, configuration identity, and physical connections. The team separately tests rejection of stale commands, agreement of sensor units, local fallback behavior, and the integrated plant contribution. Simulation Work challenges thermal and tariff behavior; Hardware-in-the-Loop Work challenges timing and fallback; a bounded plant trial challenges actual integration. Each produces observations with different claim limits.

An AI coding Agent proposes a fourth function graph and controller split. That Agent and the engineers perform candidate-generation and criticism Work; the generated graph is a description candidate. It enters the account only after its functional claims, candidate bearers, interface assumptions, and any unsupported physical dependencies are recovered.

The account retains proposals 2 and 3 and rejects proposal 1 because its local protection split cannot satisfy the declared communication-loss condition. It also records one unresolved storage-cycling evidence need. The two alternatives, allocation conflicts, predicted losses, and conditions for revisiting the decision become inputs to architecture-decision Work governed by SYSE.6.

SYSE.5:5.1 - Small Wrong-Use Check

A service machine uses one lubricant cartridge and one cleaning-solvent cartridge. Cross-connection damages seals. The engineer states the two fluid-delivery contributions and service conditions, then compares candidate cartridges, ports, seals, and connection arrangements. The retained proposal uses mechanically distinct keyed couplings whose materials and geometry fit the relevant fluids, pressure, assembly, and service conditions.

The check attempts every intended connection and the consequential swapped connections under the declared conditions. A colour label is a cue, not evidence that cross-connection is impossible. If an intended connection fails or a damaging swap remains possible, the allocation and interface proposal reopens. The trial supports the tested configurations and cases. To extend a rejection result to all production units, for example, establish that their qualified key geometry and tolerances prevent that same mating under the relevant loads.