SYSE.51:4.4 - Qualify allocation on complete attempts
Compare adaptive allocation with feasible fixed or manual alternatives under the same result requirements and resource accounting. When claiming performance beyond the construction and tuning cases, use final tasks from outside that adaptation. Measure receiving success and protected effects alongside total reasoning, evaluation, tool and integration burden in the applicable units; count failed attempts too. For people, record material differences in prior practice, assistance, fatigue and task order; repeated use of an already solved case cannot establish the same fresh-task comparison.
Select tasks that can change the useful allocation: an easy task where early stopping is warranted, a harder task where more work can resolve a material choice or establish when an existing choice is supported, or an unresolvable fact or reduced budget within the supported scope. If the rule uses an intermediate evaluator, test whether it rewards plausible but invalid progress. SYSE.49 can supply those distinctions, and SYSE.46 supplies the final configuration evidence.
When several components change together, qualify the whole arrangement unless the comparison isolates an attribution. Return a bad evaluator to its supplier, a lost premise to SYSE.52, a needless help choice to SYSE.50 and an ignored stopping decision to SYSE.47. Stop when the evidence supports the allocation needed for the task, including an existing fixed or manual one. Otherwise return the specific feasibility or evidence gap.