CC-SYSE4-1 | A conforming use SHALL identify the decision and the engineering claims it depends on, with their subjects, conditions, configurations and relevant times. When the decision depends on how claims hold together, explain that connection under §4.6. A question confined to one claim can be answered on its own grounds. |
CC-SYSE4-2 | The first result SHALL state what the present basis supports for the decision and its limits. A selected challenge SHALL name the question it can change, its validity boundary, and the earlier answers affected. Further inquiry SHALL be chosen by its attainable contribution, burden and applicable requirements; an inactive inquiry SHALL create no empty plan or waiver record. |
CC-SYSE4-3 | When intended challenge Work needs a separately identified coordination plan, it SHALL use an A.15.2 WorkPlan with its required content. The engineering-assurance plan SHALL remain distinct from that WorkPlan and from performed Work. |
CC-SYSE4-4 | A claim of performed challenge Work SHALL identify the performer through A.13 and establish the dated Work through A.15.1. A conclusion drawn from an existing result SHALL establish the provenance and qualifications its intended use requires. Use F.6 when the decision needs precise assignment-bound attribution. Each measurement, evaluation, model-use, causal, test or specialist result SHALL meet its own pattern. |
CC-SYSE4-5 | An evidence use SHALL name the target claim, result, conditions, bounded use, and the provenance and currentness grounds needed for that use. A.10 SHALL be used when the source-to-use account is implicit or must remain replayable; its descriptive path SHALL represent only independently established relations, and a carrier, result record, or graph edge SHALL NOT establish the use by presence. |
CC-SYSE4-6 | B.3 SHALL be applied when an actual named assurance claim is current, including one required by a direct domain rule. Consequence or material reliance alone SHALL NOT create that claim. The DPF account SHALL NOT substitute for the B.3 result or for direct domain obligations. |
CC-SYSE4-7 | Model, simulation, test, and digital-twin results SHALL retain their applicability, error, uncertainty, extrapolation, configuration, and evidence limits. |
CC-SYSE4-8 | Component behaviour, containing-System performance, outside effect, causality, benefit, harm, acceptance, permission, certification, release, and decision SHALL remain separately recoverable. |
CC-SYSE4-9 | The updated account SHALL state the reason for the bounded reliance conclusion, any consequential assumptions or unresolved criticism, and the project-focus, concept, architecture, realization, or specialist answers affected. A direct result or sufficient existing argument may supply that reason without a new graph, test, or assurance case. |
CC-SYSE4-10 | When evidence is missing or inapplicable, the practitioner SHALL state the gap that limits the current answer rather than assert the target claim or its negation. A next challenge is conditional on the inquiry choice in §4.2. |
CC-SYSE4-11 | A conforming use SHALL allow evidence-producing Work at any relevant time and SHALL let its results revise affected engineering answers without establishing a terminal assurance stage or lifecycle order. |