SYSE.4:2 - Problem
Systems Engineering decisions rely on different claims. A project-system choice relies on a use and boundary account. A system concept relies on proposed participation and outside effects. Architecture relies on functioning, selected structures, characteristics, and feasibility. A realization branch relies on transformer Systems, capabilities, Methods, resources, interfaces, integration, and configuration. Each claim can fail for a different reason and may need a different challenge.
Engineering sources offer checks such as observation, measurement, calculation, review, analysis, simulation, prototypes, component and integration tests, Hardware-in-the-Loop, inspection, operational monitoring, audits and assurance arguments. Identify the claim a result bears on and what it supports, challenges or leaves open. A pump bench test can support component capability while leaving the station’s downstream effect open. A software acceptance record can establish bounded acceptance without measuring production benefit. An empty-building analysis can be inapplicable to an occupied retrofit configuration.
Determine what the present evidence warrants for the decision and whether a challenge is needed. Recover relevant Work and results, or select and perform further Work when its expected contribution warrants it. State the limits on reliance and reassess any affected earlier answers. This can be done before realization, during change or integration, and after the System enters use.