SYSE.41:4.5 - Choose a safe continuation after partial failure
After a timeout or interruption, use available observations to establish which states the deployment could have reached. Select a permitted continuation, removal or return that preserves the intended result in those states. If the same step is qualified for all of them, it may be repeated. If the choice depends on which effect occurred, inspect the target or original attempt, or hold the affected step. Verify the resulting runtime separately before relying on it.
Keep an unqualified candidate out of ordinary reliance where the architecture and authority permit that separation. Preserve the working prior service rather than damaging it during an uncertain repair. If the old service is no longer available, state that constraint instead of assuming a rollback path.
Use SYSE.34 before returning binaries across a changed data boundary. If effects or readback remain unknown, stop the operation that could create duplicate resources, repeat external effects or corrupt stored data, and request the missing observation or specialist result. A “failed deployment” label does not establish that no state changed.