Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:55:15 UTC

SYSE.40:4.5 - Exercise overload, isolation and recovery

Use applicable tests, qualified bounds or an operating argument for the ordinary demand, bursts, dependency failures and delays admitted by the claim. Exercise a condition when the decision still depends on its outcome or the exercise is due. Identify any condition that remains unqualified. Check the resource observations and the accepted, rejected, delayed and partial task outcomes when the claim concerns measured performance.

Verify that the protected class still obtains its qualified result, queues stay bounded, and other tenants or downstream Systems are not made worse in an unaccepted way. Check the control/observation path under pressure; repair the arrangement if its state cannot be observed or admission cannot resume under the selected recovery conditions.

When recovery is part of the promise, use applicable observations, a qualified bound or an operating argument to establish that useful queued work can drain, admission can resume and returning clients can be served within the recovering capacity. For a claim about an actual recovery, establish what happened to the users’ work. A lower resource chart alone leaves that question open.

Return the supported operating envelope, chosen limits, response behavior and conditions still open. Use SYSE.36 to retain user-visible failure and delay in measurement, and SYSE.38 for unresolved active failures.