Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

SYSE.3:7 - Conformance Checklist

IDRequirement
CC-SYSE3-1The account SHALL identify the C.30/C.32 architecture result or linked results, selected structures and intended use that determine the next realization action.
CC-SYSE3-2If required functioning has no candidate bearer, the practitioner SHALL reopen the bearer question under A.6.F and C.32 rather than treating the missing architecture answer as realization Work.
CC-SYSE3-3An applicable existing plan MAY settle the next action. If support is missing, the result SHALL identify the branch or shared condition, the needed means or transformer, the next feasible WorkPlan item or obstacle to it, and the earlier answer that could reopen.
CC-SYSE3-4Intended change SHALL remain modal; an actual transformation claim SHALL satisfy A.3.4, and a not-yet-existing System SHALL use production and identity-inception claims rather than a fictional prior transformation.
CC-SYSE3-5A proposed transformer-role assignment and capability SHALL remain plan or candidate content until A.2.1 and A.2.2 supply their direct results.
CC-SYSE3-6The realization description and A.15.2 WorkPlan SHALL remain different epistemes; neither SHALL be treated as performed Work, actual change, production, or an actual selected network.
CC-SYSE3-7Recursion SHALL be added only when realizing a transformer System, capability, Method, tool, resource, or platform contribution changes the next action.
CC-SYSE3-8E.18 and E.18.NET SHALL be used only after their member, relation, constraint, endpoint-binding, and use-frame conditions are met; otherwise the result SHALL remain a Plain provisional realization-network description.
CC-SYSE3-9Platform, organization, operations, portfolio, configuration, integration, authority, and assurance questions SHALL retain their specialist Methods and supply named results to this branch.
CC-SYSE3-10A branch failure SHALL reopen only the affected architecture, concept, use or project-focus claims; a local failure SHALL not reopen every earlier answer.
CC-SYSE3-11DesignRunTag and flow valuation SHALL remain local to their leaf bindings; the result SHALL establish no global stage or lifecycle order.