SYSE.3:4.5 - Plan the next Work separately
Use an existing A.15.2 WorkPlan when it already supports the next action under the required joint conditions. Create or amend the plan when the action, inquiry or coordination it needs is missing. For one bounded next action,
a WorkPlan can start with one substantive PlanItem that states:
- the present EntityOfConcern and planning horizon;
- the intended Work or investigation;
- the candidate performer System and local SystemRole-kind conditions;
- the Method, capability threshold, resources, tools, access, and dependencies needed for that Work; and
- the result or evidence that could confirm or revise the branch or reopen an earlier answer.
The next Work can take different forms—for example, investigating a supplier, qualifying a capability, developing a fixture, changing a transformer System, obtaining a specialist result, integrating a bounded slice, or revising the architecture candidate. Select the action that can resolve the first open question. Plan other branches here only if they affect that action.
The WorkPlan states intended Work and its conditions. For a later claim about an assignment, capability, resource
availability, relation, Work occurrence, transformation or result, use evidence that bears directly on that claim and the pattern that defines it. When Work is later performed, use A.13 for its actual performer and A.15.1 for independent Work admission,
F.6 when precise assignment-bound attribution is needed, A.3.4 for actual changes, and A.15.PROD for
production, identity-inception, or completion claims. Compare the resulting facts with the plan only when that separate question is current.