SYSE.3:4.1 - Start from the architecture commitments required for the next action
Start with the architecture result or linked results whose realization the next action concerns. When several belong together, identify which parts or configurations must coexist and which contributions can be obtained independently. Recover:
- the current
C.30architecture question and claim; - the relevant
C.32candidate configuration orC.32.PADproject architecture decision, including any interacting constraints on that same undertaking; - the selected structures, constraints, assumptions, and expected architecture gain that matter to realization; and
- the next use for which feasibility must be known.
The input may remain modal. A candidate structure is not an obtaining ArchitectureRelation, and a project
decision does not make the decided structure actual. Keep the architecture result and the realization account
as separate claims. When provider capability, continuing provision, access, custody, responsibility, or recovery
can change realization, use only the supported claims and design constraints from a compatible SYSE.8
provider-arrangement account for the same subject, configuration, use, horizon, decision, and evidence window.
Without a compatible current account, use a qualified direct source for the claim needed by this branch or
record the missing result. Establish the
provider arrangement, provider Systems, performed Work, responsibility, and authority separately when the branch
uses them.
Check the architecture boundary before proceeding. If the candidate lacks a bearer for required functioning,
reopen the bearer question under A.6.F and C.32. For a proposed functional and structural answer, determine whether the Systems and Work needed to constitute, change, integrate or qualify it will be available together when required. The existing arrangement can already establish that they will.