SYSE.3:1 - Problem frame
An architecture can name suitable bearers for required functioning while fabrication, adaptation, integration, configuration, installation or qualification remains unsupported. A product tree, WBS, schedule or toolchain diagram can then look like a realization argument. Engineers may plan Work for a System that does not exist, assign it to a label with no capable holder, or discover late that a selected interface, material or access condition cannot be realized.
Trace the conditions the next action requires, including any that must hold across branches. When an existing plan establishes that they hold together, return the action and its grounds. Where a dependency is unresolved, choose an attainable way to settle it and use the result to confirm or revise the proposal. The pump case in :5.1 shows when a supplier and fixture inquiry is useful before fabrication.
Use this pattern after the architecture has at least one candidate bearer for every required functioning at
issue. Otherwise keep the architecture question open with A.6.F, C.30 and C.32. Use A.3.4 for an actual
bounded change, the A.15 family for Work and production claims, and E.18 or E.18.NET only when their
selected-structure conditions are met. Use Operations Management or project-portfolio practice when the live
question is queue, capacity, priority or shared-resource coordination.
When a source names a builder or enabling means—for example, a manufacturer, platform or toolchain—recover the System and
its contribution to the current branch. Establish the assignment, capability, Method, Work order or enabling relations on which this branch
relies, using their respective grounds under :4.2–4.6. Use the local TransformerSystemRole when that contribution needs
the distinction; a source label alone supplies none of those claims.