SYSE.2:4.1 - Start with one decision-changing use situation
Take the immediate engineering subject and its receiving purpose from the project-system choice account, or identify that bounded subject directly when no SoI question remains. For a creator, retain the product-use grounds while developing the creator’s own use and System concepts. If that choice is
needed but no compatible SYSE.1 account is available for the same subject and decision, use a qualified direct
source for the focus claim or record the missing project-focus result and stop only the linked claim
it blocks. A contributor can explore a linked proposal from a provisional focus. When its use depends on
joint action, use SYSE.1:4.4.1 to establish the common referent and contribution connections for that action,
or retain the unresolved coordination condition. For an actual System, describe an actual or possible-future
situation in which it participates. For a not-yet-present referent, keep the
intended participation in modal plan, decision or description content; do not report the intended System or
participation as actual. State:
- the subject that relies on, uses, changes, or is affected by the proposal;
- the direct relation by which that subject enters the use;
- the condition or change expected;
- the outside effect that matters to the current decision; and
- any uncertainty that could change the concept.
Name the relying subject under the kind that applies to it. People and technical systems are familiar examples, and other kinds are admissible. State the direct relation by which it enters the use—for example, reliance, participation, performance of Work, or affectedness. Include affected Systems or intended System referents whenever their qualified consequence claims can change the decision; participation in or ownership of the designated System is not required.